If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164053507002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.386524,"lon":-110.588005,"icon":""}]} |
Location: 00/07-35-016-05W4/2 | |
Location Alias: 00/07-35-16-05 W4M | |
Location Alias 2: 00/07-35-016-05 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 05 | |
Section: 35 | |
County/Municipality: Cypress County | |
Well Name: EXORO ENERGY MEDHAT 7-35-16-5 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0053871 | |
License Date: 1975-06-16 | |
License Status: Suspension | |
Spud Date: 1975-06-18 | |
Final Drill Date: 1975-06-28 | |
Well Total Depth: 655.30 m | |
Surface Hole Latitude: 50.386524 | |
Surface Hole Longitude: -110.588005 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-16 | Obtained License |
1975-06-28 | Finished Drilling |
1975-06-30 | Production Casing Operation Performed |
1975-10-02 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-19 | Perforation Treatment Performed - Fractured |
1975-10-30 | Well Mode changed to Drilled and Cased |
1976-08-10 | Well Began Production |
1976-08-10 | Well Fluid changed to Gas |
1976-08-10 | Well Mode changed to Flowing |
1977-08-29 | Perforation Treatment Performed - Jet Perforation |
1977-08-31 | Perforation Treatment Performed - Fractured |
1977-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-09-09 | Well Fluid changed to Gas |
1977-09-09 | Well Mode changed to Flowing |
1979-05-22 | Perforation Treatment Performed - Fractured |
1979-05-22 | Perforation Treatment Performed - Jet Perforation |
2016-06-01 | Well Fluid changed to Gas |
2016-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-02 | Selective Bullet Perforations | 200.30 | 206.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 247.50 | 248.40 | 0 |
1975-10-02 | Selective Bullet Perforations | 248.70 | 249.90 | 0 |
1975-10-02 | Selective Bullet Perforations | 250.90 | 251.80 | 0 |
1975-10-02 | Selective Bullet Perforations | 254.50 | 259.70 | 0 |
1975-10-02 | Selective Bullet Perforations | 260.90 | 273.70 | 0 |
1975-10-02 | Selective Bullet Perforations | 274.90 | 302.70 | 0 |
1975-10-02 | Selective Bullet Perforations | 303.30 | 305.70 | 0 |
1975-10-02 | Selective Bullet Perforations | 306.60 | 307.50 | 0 |
1975-10-02 | Selective Bullet Perforations | 308.50 | 309.40 | 0 |
1975-10-02 | Selective Bullet Perforations | 310.30 | 313.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 210.00 | 210.90 | 0 |
1975-10-02 | Selective Bullet Perforations | 313.90 | 314.60 | 0 |
1975-10-02 | Selective Bullet Perforations | 320.60 | 321.60 | 0 |
1975-10-02 | Selective Bullet Perforations | 322.50 | 327.10 | 0 |
1975-10-02 | Selective Bullet Perforations | 328.00 | 328.90 | 0 |
1975-10-02 | Selective Bullet Perforations | 331.90 | 332.80 | 0 |
1975-10-02 | Selective Bullet Perforations | 338.60 | 339.50 | 0 |
1975-10-02 | Selective Bullet Perforations | 340.80 | 344.10 | 0 |
1975-10-02 | Selective Bullet Perforations | 344.70 | 353.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 353.90 | 358.10 | 0 |
1975-10-02 | Selective Bullet Perforations | 358.70 | 363.60 | 0 |
1975-10-02 | Selective Bullet Perforations | 215.20 | 216.10 | 0 |
1975-10-02 | Selective Bullet Perforations | 364.20 | 371.20 | 0 |
1975-10-02 | Selective Bullet Perforations | 371.90 | 382.20 | 0 |
1975-10-02 | Selective Bullet Perforations | 382.80 | 395.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 396.20 | 401.10 | 0 |
1975-10-02 | Selective Bullet Perforations | 401.70 | 404.20 | 0 |
1975-10-02 | Selective Bullet Perforations | 404.80 | 410.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 412.10 | 415.70 | 0 |
1975-10-02 | Selective Bullet Perforations | 423.70 | 431.00 | 0 |
1975-10-02 | Selective Bullet Perforations | 434.60 | 463.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 470.00 | 470.60 | 0 |
1975-10-02 | Selective Bullet Perforations | 219.50 | 220.40 | 0 |
1975-10-02 | Selective Bullet Perforations | 473.40 | 474.30 | 0 |
1975-10-02 | Selective Bullet Perforations | 474.90 | 475.80 | 0 |
1975-10-02 | Selective Bullet Perforations | 476.40 | 482.50 | 0 |
1975-10-02 | Selective Bullet Perforations | 483.10 | 483.10 | 0 |
1975-10-19 | Fracture | 200.30 | 483.10 | 0 |
1977-08-29 | Perforation | 469.40 | 470.60 | 7 |
1977-08-29 | Perforation | 473.40 | 474.60 | 7 |
1977-08-31 | Fracture | 469.40 | 483.10 | 0 |
1977-09-09 | Packing Device Capped w/Cement | 449.60 | 457.20 | 0 |
1979-05-22 | Perforation | 307.20 | 309.00 | 7 |
1975-10-02 | Selective Bullet Perforations | 221.30 | 224.90 | 0 |
1979-05-22 | Perforation | 337.10 | 338.90 | 7 |
1979-05-22 | Fracture | 303.30 | 339.50 | 0 |
1975-10-02 | Selective Bullet Perforations | 225.60 | 228.00 | 0 |
1975-10-02 | Selective Bullet Perforations | 229.20 | 236.20 | 0 |
1975-10-02 | Selective Bullet Perforations | 237.40 | 244.80 | 0 |
1975-10-02 | Selective Bullet Perforations | 245.70 | 246.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 1839 | 0.0 | 0.0 | 0.0 |
1977 | 7464 | 0.0 | 0.0 | 0.0 |
1978 | 7743 | 0.0 | 0.0 | 0.0 |
1979 | 7305 | 0.0 | 0.0 | 0.0 |
1980 | 6486 | 0.0 | 0.0 | 0.0 |
1981 | 3998 | 0.0 | 0.0 | 0.0 |
1982 | 7521 | 0.0 | 0.0 | 0.0 |
1983 | 2566 | 0.0 | 0.0 | 0.0 |
1984 | 490 | 0.0 | 0.0 | 0.0 |
1985 | 883 | 0.0 | 0.0 | 0.0 |
1986 | 1627 | 0.0 | 0.0 | 0.0 |
1987 | 717 | 0.0 | 0.0 | 0.0 |
1989 | 6644 | 0.0 | 0.0 | 0.0 |
1990 | 8753 | 0.0 | 0.0 | 0.0 |
1991 | 3891 | 0.0 | 0.0 | 0.0 |
1992 | 8778 | 0.0 | 0.0 | 0.0 |
1993 | 8588 | 0.0 | 0.0 | 0.0 |
1994 | 8757 | 0.0 | 0.0 | 0.0 |
1995 | 8750 | 0.0 | 0.0 | 0.0 |
1996 | 8774 | 0.0 | 0.0 | 0.0 |
1997 | 8751 | 0.0 | 0.0 | 0.0 |
1998 | 8737 | 0.0 | 0.0 | 0.0 |
1999 | 8719 | 0.0 | 0.0 | 0.0 |
2000 | 8783 | 0.0 | 0.0 | 0.0 |
2001 | 8759 | 0.0 | 0.0 | 0.0 |
2002 | 8759 | 0.0 | 0.0 | 0.0 |
2003 | 8740 | 0.0 | 0.0 | 0.0 |
2004 | 8268 | 0.0 | 0.0 | 0.0 |
2005 | 8195 | 0.0 | 0.0 | 0.0 |
2006 | 8634 | 0.0 | 0.0 | 0.0 |
2007 | 7895 | 0.0 | 0.0 | 0.0 |
2008 | 8582 | 0.0 | 0.0 | 0.0 |
2009 | 8689 | 0.0 | 0.0 | 0.0 |
2010 | 8686 | 0.0 | 0.0 | 0.0 |
2011 | 8600 | 0.0 | 0.0 | 0.0 |
2012 | 8614 | 0.0 | 0.0 | 0.0 |
2013 | 8615 | 0.0 | 0.0 | 0.0 |
2014 | 8548 | 0.0 | 0.0 | 0.0 |
2015 | 5217 | 0.0 | 0.0 | 0.0 |
For data sources see[5]