X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164113006030

Well Details

Well ID: 0164113006030
Loading map...
Location: 03/06-30-016-11W4/0
Location Alias: 03/06-30-16-11 W4M
Location Alias 2: 03/06-30-016-11 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 11
Section: 30
County/Municipality: County of Newell
Well Name: CARDINAL 103 HZ ALDSON 6-30-16-11
Operator Name: Cardinal Energy Ltd.
License Number: 0494304
License Date: 2019-04-26
License Status: Issued
Spud Date: 2019-04-18
Final Drill Date: 2019-04-22
Well Total Depth: 3049.00 m
Surface Hole Latitude: 50.393181
Surface Hole Longitude: -111.517629

For data sources see[1][2]

Well History

Date Event
2019-04-19 Direction Drilling Operation Performed - Deviate
2019-04-19 Surface Casing Operation Performed
2019-04-20 Direction Drilling Operation Performed - Horizontal
2019-04-22 Finished Drilling
2019-04-22 Well Mode changed to Drilled and Cased
2019-04-23 Well Log Performed
2019-04-24 Intermediate Casing Operation Performed
2019-04-24 Perforation Treatment Performed - Open-Hole Completion
2019-04-24 Rig Released
2019-04-25 Well Log Performed
2019-04-26 Obtained License
2019-04-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-09 Well Began Production
2019-05-09 Well Fluid changed to Crude Oil
2019-05-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-04-30 Bonanza Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-04-19 641.50 Deviate (5 - 79 degrees)
2019-04-20 1083.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-04-24 Open Hole/Barefoot Completion 2943.00 3049.00 0
2019-04-30 Multi-Stage Fracture 2560.10 2560.50 0
2019-04-30 Multi-Stage Fracture 2521.20 2521.60 0
2019-04-30 Multi-Stage Fracture 2482.30 2482.70 0
2019-04-30 Multi-Stage Fracture 2443.30 2443.70 0
2019-04-30 Multi-Stage Fracture 2403.70 2404.10 0
2019-04-30 Multi-Stage Fracture 2364.20 2364.60 0
2019-04-30 Multi-Stage Fracture 2326.70 2327.10 0
2019-04-30 Multi-Stage Fracture 2285.90 2286.30 0
2019-04-30 Multi-Stage Fracture 2245.20 2245.60 0
2019-04-30 Multi-Stage Fracture 2204.40 2204.80 0
2019-04-30 Multi-Stage Fracture 2904.90 2905.30 0
2019-04-30 Multi-Stage Fracture 2165.20 2165.60 0
2019-04-30 Multi-Stage Fracture 2124.50 2124.90 0
2019-05-01 Multi-Stage Fracture 2083.50 2083.90 0
2019-05-01 Multi-Stage Fracture 2042.80 2043.20 0
2019-05-01 Multi-Stage Fracture 2005.70 2006.10 0
2019-05-01 Multi-Stage Fracture 1966.80 1967.20 0
2019-05-01 Multi-Stage Fracture 1927.40 1927.80 0
2019-05-01 Multi-Stage Fracture 1886.10 1886.50 0
2019-05-01 Multi-Stage Fracture 1845.10 1845.50 0
2019-05-01 Multi-Stage Fracture 1804.00 1804.40 0
2019-04-30 Multi-Stage Fracture 2800.20 2800.60 0
2019-05-01 Multi-Stage Fracture 1762.80 1763.20 0
2019-05-01 Multi-Stage Fracture 1721.60 1722.00 0
2019-05-01 Multi-Stage Fracture 1680.60 1681.00 0
2019-05-01 Multi-Stage Fracture 1639.60 1640.00 0
2019-05-01 Multi-Stage Fracture 1598.50 1598.90 0
2019-05-01 Multi-Stage Fracture 1557.80 1558.20 0
2019-05-01 Multi-Stage Fracture 1516.80 1517.20 0
2019-05-01 Multi-Stage Fracture 1475.30 1475.70 0
2019-05-01 Multi-Stage Fracture 1434.30 1434.70 0
2019-05-01 Multi-Stage Fracture 1393.10 1393.50 0
2019-04-30 Multi-Stage Fracture 2776.10 2776.50 0
2019-05-01 Multi-Stage Fracture 1352.20 1352.60 0
2019-05-01 Multi-Stage Fracture 1312.60 1313.00 0
2019-05-01 Multi-Stage Fracture 1271.70 1272.10 0
2019-05-01 Multi-Stage Fracture 1230.60 1231.00 0
2019-04-30 Multi-Stage Fracture 2740.80 2741.20 0
2019-04-30 Multi-Stage Fracture 2703.40 2703.80 0
2019-04-30 Multi-Stage Fracture 2667.90 2668.30 0
2019-04-30 Multi-Stage Fracture 2632.70 2633.10 0
2019-04-30 Multi-Stage Fracture 2597.20 2597.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-04-30 2019-05-01 957 2,072 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.826 N/A
water Not Available 100 42.2148 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 22.5971 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0089 N/A
dibromoacetonitrile 3252-43-5 100 0.0089 N/A
non-hazardous ingredients Not Available 100 0.0089 N/A
polyethylene glycol 25322-68-3 100 0.0089 N/A
sodium bromide 7647-15-6 100 0.0089 N/A
BXL-A Trican Breaker diethanolamine 111-42-2 100 0.0815 N/A
non-hazardous ingredients Not Available 100 0.0815 N/A
triethanolamine 102-71-6 100 0.0815 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0377 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0378 N/A
AI-12 Trican Corrosion Inhibitor 1-decanol 112-30-1 100 0.002 N/A
1-octanol 111-87-5 100 0.002 N/A
branched nonylphenol polyethylene glycol ether 127087-87-0 100 0.002 N/A
cinnamaldehyde 104-55-2 100 0.002 N/A
dipropylene glycol monomethyl ether 34590-94-8 100 0.002 N/A
ethylene glycol 107-21-1 100 0.002 N/A
formic acid 64-18-6 100 0.002 N/A
isopropanol 67-63-0 100 0.002 N/A
tar bases. quinoline derives 68513-87-1 100 0.002 N/A
tar bases. quinoline derives.. benzyl chloride-quaternized 72480-70-7 100 0.002 N/A
triethyl phosphate 78-40-0 100 0.002 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1902 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1902 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0078 N/A
propylene glycol 57-55-6 100 0.0078 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0009 N/A
propylene glycol 57-55-6 100 0.0009 N/A
WG-111DSA Trican Gelling Agent non-hazardous ingredients Not Available 100 0.1811 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0047 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0367 N/A
non-hazardous ingredients Not Available 100 0.0367 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-04-26 2019-04-29 Municipal Water 2052

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5744 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-24 No Incident Encountered 0.00 0.00
2019-05-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References