If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0164161801002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.342203,"lon":-112.186331,"icon":""}]} |
| Location: 00/01-18-016-16W4/2 | |
| Location Alias: 00/01-18-16-16 W4M | |
| Location Alias 2: 00/01-18-016-16 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 016 | |
| Meridian: 4 | |
| Range: 16 | |
| Section: 18 | |
| County/Municipality: Vulcan County | |
| Well Name: CNRL ENCHANT 1-18-16-16 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0299780 | |
| License Date: 2003-12-22 | |
| License Status: Suspension | |
| Spud Date: 2004-01-05 | |
| Final Drill Date: 2004-01-08 | |
| Well Total Depth: 1093.00 m | |
| Surface Hole Latitude: 50.342203 | |
| Surface Hole Longitude: -112.186331 |
| Date | Event |
|---|---|
| 2003-12-22 | Obtained License |
| 2004-01-06 | Surface Casing Operation Performed |
| 2004-01-08 | Finished Drilling |
| 2004-01-08 | Well Log Performed |
| 2004-01-08 | Well Mode changed to Drilled and Cased |
| 2004-01-09 | Production Casing Operation Performed |
| 2004-01-09 | Rig Released |
| 2004-01-12 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-12 | Well Log Performed |
| 2004-01-13 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-13 | Well Log Performed |
| 2004-02-08 | Well Began Production |
| 2004-02-08 | Well Fluid changed to Gas |
| 2004-02-08 | Well Mode changed to Flowing |
| 2004-04-20 | Perforation Treatment Performed - Fractured |
| 2006-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-02-28 | Plug Back Performed |
| 2006-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-03-01 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-01 | Plug Back Performed |
| 2006-03-01 | Well Log Performed |
| 2006-03-02 | Well Fluid changed to Gas |
| 2006-03-02 | Well Mode changed to Suspended |
| 2006-03-03 | Well Fluid changed to Gas |
| 2006-03-03 | Well Mode changed to Abandoned Zone |
| 2011-08-17 | Well Log Performed |
| 2011-08-18 | Well Log Performed |
| 2011-08-19 | Well Log Performed |
| 2011-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-08-24 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-24 | Plug Back Performed |
| 2011-08-24 | Well Log Performed |
| 2011-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-08-25 | Well Log Performed |
| 2011-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-08-26 | Perforation Treatment Performed - Remedial Casing |
| 2012-05-31 | Well Log Performed |
| 2012-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-06-02 | Perforation Treatment Performed - Jet Perforation |
| 2012-06-02 | Perforation Treatment Performed - Remedial Casing |
| 2012-06-02 | Well Log Performed |
| 2012-08-09 | Perforation Treatment Performed - Jet Perforation |
| 2012-08-09 | Well Log Performed |
| 2012-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-08-10 | Perforation Treatment Performed - Remedial Casing |
| 2013-07-16 | Well Log Performed |
| 2013-07-18 | Perforation Treatment Performed - Jet Perforation |
| 2013-07-18 | Well Log Performed |
| 2013-07-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-07-19 | Perforation Treatment Performed - Remedial Casing |
| 2013-07-22 | Perforation Treatment Performed - Jet Perforation |
| 2013-07-22 | Well Log Performed |
| 2013-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-07-23 | Perforation Treatment Performed - Remedial Casing |
| 2014-09-14 | Well Log Performed |
| 2014-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-09-16 | Perforation Treatment Performed - Jet Perforation |
| 2014-09-16 | Well Log Performed |
| 2014-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-09-17 | Perforation Treatment Performed - Remedial Casing |
| 2015-09-25 | Perforation Treatment Performed - Jet Perforation |
| 2015-09-25 | Well Log Performed |
| 2015-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-09-26 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-01-12 | Perforation | 1066.00 | 1067.50 | 17 |
| 2011-08-24 | Perforation | 790.50 | 793.50 | 13 |
| 2011-08-25 | Acid Treatment | 789.00 | 793.50 | 0 |
| 2011-08-26 | Remedial Casing Cementing | 789.00 | 793.50 | 0 |
| 2011-08-26 | Packing Device Capped w/Cement | 770.60 | 782.60 | 0 |
| 2012-06-02 | Perforation | 324.00 | 327.00 | 17 |
| 2012-06-02 | Remedial Casing Cementing | 324.00 | 327.00 | 0 |
| 2012-06-02 | Packing Device Capped w/Cement | 275.00 | 320.00 | 0 |
| 2012-08-09 | Perforation | 227.00 | 230.00 | 17 |
| 2012-08-10 | Remedial Casing Cementing | 227.00 | 230.00 | 0 |
| 2012-08-10 | Packing Device Capped w/Cement | 216.20 | 225.20 | 0 |
| 2004-01-13 | Perforation | 1050.50 | 1053.00 | 17 |
| 2013-07-18 | Perforation | 691.00 | 694.00 | 17 |
| 2013-07-19 | Remedial Casing Cementing | 691.00 | 694.00 | 0 |
| 2013-07-19 | Packing Device Capped w/Cement | 678.00 | 688.00 | 0 |
| 2013-07-22 | Perforation | 465.00 | 468.00 | 17 |
| 2013-07-23 | Remedial Casing Cementing | 465.00 | 468.00 | 0 |
| 2013-07-23 | Packing Device Capped w/Cement | 453.00 | 461.00 | 0 |
| 2014-09-16 | Packing Device Capped w/Cement | 452.00 | 460.00 | 0 |
| 2014-09-16 | Perforation | 433.00 | 436.00 | 17 |
| 2014-09-17 | Remedial Casing Cementing | 433.00 | 436.00 | 0 |
| 2014-09-17 | Packing Device Capped w/Cement | 421.00 | 429.00 | 0 |
| 2004-04-20 | Fracture | 1050.50 | 1053.00 | 0 |
| 2015-09-25 | Perforation | 602.00 | 605.00 | 17 |
| 2015-09-26 | Remedial Casing Cementing | 602.00 | 605.00 | 0 |
| 2015-09-26 | Packing Device Capped w/Cement | 579.00 | 597.00 | 0 |
| 2006-02-28 | Packing Device Capped w/Cement | 1057.00 | 1065.00 | 0 |
| 2006-03-01 | Packing Device Capped w/Cement | 1040.00 | 1048.00 | 0 |
| 2006-03-01 | Perforation | 1027.50 | 1028.70 | 17 |
| 2006-03-01 | Perforation | 1030.30 | 1032.30 | 17 |
| 2011-08-24 | Packing Device Capped w/Cement | 1014.00 | 1022.00 | 0 |
| 2011-08-24 | Perforation | 789.00 | 792.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 5991 | 0.0 | 0.0 | 0.0 |
| 2005 | 2461 | 0.0 | 0.0 | 0.0 |
| 2006 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-07-24 | No Incident Encountered | 0.00 | 0.00 |
| 2015-04-28 | No Incident Encountered | 0.00 | 0.00 |
| 2016-02-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]