X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164162206020

Well Details

Well ID: 0164162206020
Loading map...
Location: 02/06-22-016-16W4/0
Location Alias: 02/06-22-16-16 W4M
Location Alias 2: 02/06-22-016-16 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 16
Section: 22
County/Municipality: County of Newell
Well Name: COMPTON ENCHANT 6-22-16-16
Operator Name: Lexin Resources Ltd.
License Number: 0247440
License Date: 2000-12-18
License Status: Suspension
Spud Date: 2001-01-11
Final Drill Date: 2001-01-16
Well Total Depth: 1100.00 m
Surface Hole Latitude: 50.358054
Surface Hole Longitude: -112.128718

For data sources see[1][2]

Well History

Date Event
2000-12-18 Obtained License
2001-01-12 Surface Casing Operation Performed
2001-01-16 Finished Drilling
2001-01-16 Production Casing Operation Performed
2001-01-16 Well Log Performed
2001-01-17 Rig Released
2001-01-17 Well Mode changed to Drilled and Cased
2001-01-24 Perforation Treatment Performed - Jet Perforation
2001-01-27 Perforation Treatment Performed - Fractured
2007-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-06 Plug Back Performed
2007-07-06 Well Log Performed
2007-07-08 Well Log Performed
2007-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-09 Plug Back Performed
2007-07-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-07-11 Perforation Treatment Performed - Cement Squeeze
2007-07-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-07-30 Perforation Treatment Performed - Cement Squeeze
2008-07-06 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-24 Perforation 1030.00 1032.00 17
2001-01-27 Fracture 1030.00 1032.00 0
2007-07-06 Packing Device Capped w/Cement 1012.00 1020.00 0
2007-07-09 Packing Device Capped w/Cement 527.20 535.20 0
2007-07-10 Hydra Jet Perforation 283.00 283.50 1
2007-07-11 Cement Squeeze 283.00 283.50 0
2007-07-29 Hydra Jet Perforation 273.00 273.50 1
2007-07-30 Cement Squeeze 273.00 273.50 0

For data sources see[4]



References