X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164162607000

Well Details

Well ID: 0164162607000
Loading map...
Location: 00/07-26-016-16W4/0
Location Alias: 00/07-26-16-16 W4M
Location Alias 2: 00/07-26-016-16 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 16
Section: 26
County/Municipality: County of Newell
Well Name: KANEX ENERGY RAINIER 7-26-16-16
Operator Name: Success Resources Ltd.
License Number: 0221820
License Date: 1999-02-26
License Status: Suspension
Spud Date: 1999-03-05
Final Drill Date: 1999-03-11
Well Total Depth: 1322.00 m
Surface Hole Latitude: 50.376005
Surface Hole Longitude: -112.087584

For data sources see[1][2]

Well History

Date Event
1999-02-26 Obtained License
1999-03-05 Direction Drilling Operation Performed - Deviate
1999-03-06 Surface Casing Operation Performed
1999-03-11 Finished Drilling
1999-03-11 Well Log Performed
1999-03-12 Rig Released
1999-03-12 Well Log Performed
1999-03-12 Well Mode changed to Drilled and Cased
1999-03-13 Production Casing Operation Performed
1999-03-26 Well Log Performed
1999-05-30 Perforation Treatment Performed - Jet Perforation
1999-05-30 Well Log Performed
1999-07-22 Perforation Treatment Performed - Fractured
1999-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-09 Plug Back Performed
1999-08-09 Well Log Performed
1999-08-09 Well Mode changed to Abandoned Zone
1999-08-10 Perforation Treatment Performed - Jet Perforation
1999-08-10 Well Log Performed
1999-08-29 Well Log Performed
2000-11-23 Perforation Treatment Performed - Fractured
2001-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-24 Perforation Treatment Performed - Jet Perforation
2001-01-24 Plug Back Performed
2002-06-18 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-06-18 Perforation Treatment Performed - Jet Perforation
2002-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-20 Plug Back Performed
2004-05-20 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-03-05 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-05-30 Perforation 1284.00 1285.00 20
2002-06-18 Perforation 1042.00 1044.50 17
2002-12-20 Packing Device Capped w/Cement 1032.00 1040.00 0
2004-05-20 Perforation 1016.00 1019.00 17
1999-05-30 Perforation 1289.00 1291.50 20
1999-07-22 Fracture 1284.00 1291.50 0
1999-08-09 Packing Device Capped w/Cement 1267.00 1275.00 0
1999-08-10 Perforation 1182.50 1185.50 20
2000-11-23 Fracture 1182.50 1185.50 0
2001-01-24 Packing Device Capped w/Cement 1167.00 1175.00 0
2001-01-24 Perforation 1052.00 1054.00 17
2002-06-18 Bridge Plug, No Cement 1051.00 1052.00 0

For data sources see[5]



References