If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0164241308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.34475,"lon":-113.169066,"icon":""}]} |
| Location: 00/08-13-016-24W4/0 | |
| Location Alias: 00/08-13-16-24 W4M | |
| Location Alias 2: 00/08-13-016-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 016 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 13 | |
| County/Municipality: Vulcan County | |
| Well Name: TRL ET AL VULCAN 8-13-16-24 | |
| Operator Name: Trekelano Resources Ltd. | |
| License Number: 0004599 | |
| License Date: 1952-05-01 | |
| License Status: RecCertified | |
| Spud Date: 1952-05-29 | |
| Final Drill Date: 1952-10-11 | |
| Well Total Depth: 2504.20 m | |
| Surface Hole Latitude: 50.344750 | |
| Surface Hole Longitude: -113.169066 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-05-01 | Obtained License |
| 1952-06-21 | Drill Stem Test Performed |
| 1952-06-27 | Drill Stem Test Performed |
| 1952-07-28 | Drill Stem Test Performed |
| 1952-07-30 | Drill Stem Test Performed |
| 1952-08-01 | Drill Stem Test Performed |
| 1952-08-03 | Drill Stem Test Performed |
| 1952-08-05 | Drill Stem Test Performed |
| 1952-08-06 | Drill Stem Test Performed |
| 1952-08-08 | Drill Stem Test Performed |
| 1952-08-09 | Drill Stem Test Performed |
| 1952-09-02 | Drill Stem Test Performed |
| 1952-09-13 | Drill Stem Test Performed |
| 1952-09-17 | Drill Stem Test Performed |
| 1952-09-23 | Drill Stem Test Performed |
| 1952-09-28 | Drill Stem Test Performed |
| 1952-09-29 | Drill Stem Test Performed |
| 1952-10-01 | Drill Stem Test Performed |
| 1952-10-03 | Drill Stem Test Performed |
| 1952-10-05 | Drill Stem Test Performed |
| 1952-10-07 | Drill Stem Test Performed |
| 1952-10-11 | Drill Stem Test Performed |
| 1952-10-11 | Finished Drilling |
| 1952-10-16 | Production Casing Operation Performed |
| 1952-10-23 | Perforation Treatment Performed - Bullet Perforation |
| 1952-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1952-10-28 | Perforation Treatment Performed - Bullet Perforation |
| 1952-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1952-10-29 | Perforation Treatment Performed - Bullet Perforation |
| 1952-10-29 | Perforation Treatment Performed - Cement Squeeze |
| 1952-11-04 | Perforation Treatment Performed - Bullet Perforation |
| 1952-11-04 | Perforation Treatment Performed - Cement Plug |
| 1952-11-06 | Perforation Treatment Performed - Bullet Perforation |
| 1952-11-07 | Perforation Treatment Performed - Cement Plug |
| 1952-11-09 | Perforation Treatment Performed - Bullet Perforation |
| 1952-11-11 | Perforation Treatment Performed - Jet Perforation |
| 1952-11-12 | Perforation Treatment Performed - Cement Squeeze |
| 1952-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-11-15 | Perforation Treatment Performed - Cement Squeeze |
| 1952-11-17 | Perforation Treatment Performed - Jet Perforation |
| 1952-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-11-20 | Perforation Treatment Performed - Cement Squeeze |
| 1952-12-08 | Perforation Treatment Performed - Jet Perforation |
| 1952-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-12-11 | Perforation Treatment Performed - Jet Perforation |
| 1952-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-12-14 | Perforation Treatment Performed - Cement Squeeze |
| 1952-12-16 | Perforation Treatment Performed - Jet Perforation |
| 1952-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-01-14 | Perforation Treatment Performed - Fractured |
| 1953-03-18 | Well Mode changed to Drilled and Cased |
| 1962-02-15 | Well Began Production |
| 1962-02-15 | Well Fluid changed to Crude Oil |
| 1962-02-15 | Well Mode changed to Flowing |
| 1962-02-28 | Well Fluid changed to Crude Oil |
| 1962-02-28 | Well Mode changed to Pumping |
| 1995-12-14 | Well Fluid changed to Crude Oil |
| 1995-12-14 | Well Mode changed to Closed |
| 1996-05-02 | Well Fluid changed to Crude Oil |
| 1996-05-02 | Well Mode changed to Pumping |
| 2000-01-19 | Well Fluid changed to Crude Oil |
| 2000-01-19 | Well Mode changed to Closed |
| 2001-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-02-08 | Perforation Treatment Performed - Jet Perforation |
| 2001-02-08 | Plug Back Performed |
| 2001-02-09 | Perforation Treatment Performed - Remedial Casing |
| 2001-02-15 | Well Abandoned |
| 2001-02-15 | Well Fluid changed to Crude Oil |
| 2001-02-15 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-10-23 | Bullet Perforation | 2470.40 | 2473.50 | 13 |
| 1952-11-04 | Cement Plug | 2347.00 | 2385.10 | 0 |
| 1952-11-06 | Bullet Perforation | 2037.30 | 2043.40 | 13 |
| 1952-11-07 | Cement Plug | 1920.20 | 2072.60 | 0 |
| 1952-11-09 | Bullet Perforation | 1708.40 | 1714.50 | 13 |
| 1952-11-11 | Perforation | 1672.70 | 1677.90 | 13 |
| 1952-11-12 | Cement Squeeze | 1708.40 | 1714.50 | 0 |
| 1952-11-13 | Acid Treatment | 1672.70 | 1677.90 | 0 |
| 1952-11-15 | Cement Squeeze | 1672.70 | 1677.90 | 0 |
| 1952-11-17 | Perforation | 1670.90 | 1674.00 | 13 |
| 1952-11-18 | Acid Treatment | 1670.90 | 1674.00 | 0 |
| 1952-10-25 | Acid Treatment | 2470.40 | 2473.50 | 0 |
| 1952-11-20 | Cement Squeeze | 1670.90 | 1674.00 | 0 |
| 1952-12-08 | Perforation | 1672.40 | 1673.70 | 13 |
| 1952-12-08 | Perforation | 1673.40 | 1674.60 | 13 |
| 1952-12-09 | Acid Treatment | 1672.40 | 1674.60 | 0 |
| 1952-12-11 | Perforation | 1673.70 | 1674.90 | 13 |
| 1952-12-12 | Acid Treatment | 1672.40 | 1674.90 | 0 |
| 1952-12-14 | Cement Squeeze | 1672.40 | 1674.90 | 0 |
| 1952-12-16 | Perforation | 1627.60 | 1632.50 | 13 |
| 1952-12-20 | Acid Treatment | 1627.60 | 1632.50 | 0 |
| 1952-12-22 | Acid Treatment | 1627.60 | 1632.50 | 0 |
| 1952-10-28 | Packing Device Capped w/Cement | 2467.40 | 2467.40 | 0 |
| 1953-01-14 | Fracture | 1627.60 | 1632.50 | 0 |
| 2001-02-08 | Packing Device Capped w/Cement | 1627.60 | 1632.50 | 0 |
| 2001-02-08 | Perforation | 280.00 | 280.50 | 16 |
| 2001-02-09 | Remedial Casing Cementing | 280.00 | 280.50 | 0 |
| 1952-10-28 | Bullet Perforation | 2433.80 | 2436.90 | 13 |
| 1952-10-29 | Cement Squeeze | 2433.80 | 2436.90 | 0 |
| 1952-10-29 | Bullet Perforation | 2420.10 | 2426.20 | 13 |
| 1952-10-29 | Acid Treatment | 2420.10 | 2426.20 | 0 |
| 1952-10-29 | Packing Device Capped w/Cement | 2407.90 | 2407.90 | 0 |
| 1952-11-04 | Bullet Perforation | 2388.10 | 2394.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 1464 | 0.0 | 0.0 | 0.0 |
| 1969 | 8759 | 0.0 | 0.0 | 0.0 |
| 1970 | 8759 | 0.0 | 0.0 | 0.0 |
| 1971 | 8759 | 0.0 | 0.0 | 0.0 |
| 1972 | 8015 | 0.0 | 0.0 | 0.0 |
| 1973 | 7296 | 0.0 | 0.0 | 0.0 |
| 1974 | 1608 | 0.0 | 0.0 | 0.0 |
| 1975 | 144 | 0.0 | 0.0 | 0.0 |
| 1976 | 1042 | 0.0 | 0.0 | 0.0 |
| 1977 | 1824 | 0.0 | 0.0 | 0.0 |
| 1978 | 3344 | 0.0 | 0.0 | 0.0 |
| 1979 | 6714 | 0.0 | 0.0 | 0.0 |
| 1980 | 3629 | 0.0 | 0.0 | 0.0 |
| 1981 | 3866 | 0.0 | 0.0 | 0.0 |
| 1982 | 7503 | 0.0 | 0.0 | 0.0 |
| 1983 | 7052 | 0.0 | 0.0 | 0.0 |
| 1984 | 6869 | 0.0 | 0.0 | 0.0 |
| 1985 | 8700 | 0.0 | 0.0 | 0.0 |
| 1986 | 8517 | 0.0 | 0.0 | 0.0 |
| 1987 | 4483 | 0.0 | 0.0 | 0.0 |
| 1988 | 676 | 0.0 | 0.0 | 0.0 |
| 1990 | 1314 | 0.0 | 0.0 | 0.0 |
| 1991 | 695 | 0.0 | 0.0 | 0.0 |
| 1993 | 6192 | 0.0 | 0.0 | 0.0 |
| 1994 | 492 | 0.0 | 0.0 | 0.0 |
| 1996 | 80 | 0.0 | 0.0 | 0.0 |
For data sources see[5]