If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164293310003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.392538,"lon":-113.928035,"icon":""}]} |
Location: 00/10-33-016-29W4/3 | |
Location Alias: 00/10-33-16-29 W4M | |
Location Alias 2: 00/10-33-016-29 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 29 | |
Section: 33 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: MOBIL COMPTON HOOKER 10-33-16-29 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0221070 | |
License Date: 1999-01-29 | |
License Status: Suspension | |
Spud Date: 1999-02-05 | |
Final Drill Date: 1999-03-06 | |
Well Total Depth: 2773.00 m | |
Surface Hole Latitude: 50.392538 | |
Surface Hole Longitude: -113.928035 |
Date | Event |
---|---|
1999-01-29 | Obtained License |
1999-02-28 | Surface Casing Operation Performed |
1999-03-06 | Finished Drilling |
1999-03-06 | Well Log Performed |
1999-03-06 | Well Mode changed to Drilled and Cased |
1999-03-07 | Drill Stem Test Performed |
1999-03-08 | Drill Stem Test Performed |
1999-03-09 | Drill Stem Test Performed |
1999-03-10 | Drill Stem Test Performed |
1999-03-14 | Production Casing Operation Performed |
1999-03-15 | Rig Released |
1999-03-21 | Well Log Performed |
1999-03-22 | Perforation Treatment Performed - Jet Perforation |
1999-03-22 | Well Log Performed |
1999-03-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-27 | Perforation Treatment Performed - Jet Perforation |
1999-03-27 | Well Log Performed |
1999-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-04-22 | Well Log Performed |
1999-05-13 | Perforation Treatment Performed - Fractured |
1999-05-13 | Perforation Treatment Performed - Jet Perforation |
1999-05-13 | Well Log Performed |
2000-10-04 | Well Log Performed |
2004-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-19 | Plug Back Performed |
2004-09-21 | Perforation Treatment Performed - Cement Squeeze |
2004-09-21 | Plug Back Performed |
2004-09-22 | Perforation Treatment Performed - Jet Perforation |
2004-09-24 | Perforation Treatment Performed - Jet Perforation |
2004-09-24 | Well Log Performed |
2004-09-27 | Perforation Treatment Performed - Fractured |
2004-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-30 | Plug Back Performed |
2004-10-01 | Perforation Treatment Performed - Jet Perforation |
2004-10-02 | Perforation Treatment Performed - Fractured |
2004-10-05 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-03-22 | Perforation | 2693.00 | 2694.00 | 17 |
1999-05-13 | Fracture | 2282.50 | 2284.50 | 0 |
2004-09-19 | Packing Device Capped w/Cement | 2659.00 | 2667.00 | 0 |
2004-09-21 | Cement Squeeze | 2282.50 | 2284.50 | 0 |
2004-09-22 | Perforation | 2282.50 | 2284.50 | 17 |
2004-09-24 | Perforation | 2623.00 | 2625.00 | 17 |
2004-09-27 | Fracture | 2623.00 | 2625.00 | 0 |
2004-09-30 | Packing Device Capped w/Cement | 2602.00 | 2610.00 | 0 |
2004-10-01 | Perforation | 1417.50 | 1418.50 | 14 |
2004-10-01 | Perforation | 1407.50 | 1411.50 | 14 |
2004-10-02 | Fracture | 1417.50 | 1418.50 | 0 |
1999-03-22 | Perforation | 2695.50 | 2696.50 | 17 |
2004-10-05 | Perforation | 1318.00 | 1320.00 | 14 |
2004-10-05 | Perforation | 1312.50 | 1314.50 | 14 |
1999-03-22 | Perforation | 2697.50 | 2698.50 | 17 |
1999-03-24 | Acid Treatment | 2693.00 | 2698.50 | 0 |
1999-03-27 | Perforation | 2688.00 | 2690.00 | 17 |
1999-03-27 | Perforation | 2681.00 | 2684.00 | 17 |
1999-03-27 | Perforation | 2674.00 | 2675.00 | 17 |
1999-03-30 | Acid Treatment | 2674.00 | 2690.00 | 0 |
1999-05-13 | Perforation | 2282.50 | 2284.50 | 17 |
For data sources see[4]