If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174290116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.410825,"lon":-113.855693,"icon":""}]} |
Location: 00/16-01-017-29W4/0 | |
Location Alias: 00/16-01-17-29 W4M | |
Location Alias 2: 00/16-01-017-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 29 | |
Section: 01 | |
County/Municipality: Foothills County | |
Well Name: MOBIL COMPTON HIGH RIVER 16-1-17-29 | |
Operator Name: Bighorn Energy Corporation | |
License Number: 0228772 | |
License Date: 1999-11-17 | |
License Status: Suspension | |
Spud Date: 1999-11-25 | |
Final Drill Date: 1999-12-21 | |
Well Total Depth: 2610.00 m | |
Surface Hole Latitude: 50.410825 | |
Surface Hole Longitude: -113.855693 |
Date | Event |
---|---|
1999-11-17 | Obtained License |
1999-11-28 | Surface Casing Operation Performed |
1999-12-21 | Finished Drilling |
1999-12-22 | Well Log Performed |
1999-12-23 | Drill Stem Test Performed |
1999-12-24 | Drill Stem Test Performed |
1999-12-26 | Drill Stem Test Performed |
1999-12-27 | Drill Stem Test Performed |
1999-12-30 | Intermediate Casing Operation Performed |
1999-12-30 | Liner Casing Operation Performed |
1999-12-30 | Rig Released |
1999-12-30 | Well Mode changed to Drilled and Cased |
2000-01-06 | Perforation Treatment Performed - Jet Perforation |
2000-01-06 | Well Log Performed |
2000-01-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-01-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
2000-01-08 | Perforation Treatment Performed - Jet Perforation |
2000-01-11 | Well Log Performed |
2000-01-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-13 | Plug Back Performed |
2000-01-14 | Perforation Treatment Performed - Fractured |
2000-01-14 | Perforation Treatment Performed - Jet Perforation |
2000-01-14 | Well Log Performed |
2000-06-15 | Well Mode changed to Drilled and Cased |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-01-06 | Perforation | 2530.50 | 2534.00 | 17 |
2000-01-08 | Perforation | 2535.00 | 2538.00 | 17 |
2000-01-08 | Perforation | 2539.50 | 2541.50 | 17 |
2000-01-08 | Acid Wash | 2530.50 | 2541.50 | 0 |
2000-01-08 | Acid Treatment | 2530.50 | 2541.50 | 0 |
2000-01-13 | Packing Device Capped w/Cement | 2517.00 | 2525.00 | 0 |
2000-01-14 | Perforation | 2503.50 | 2509.00 | 17 |
2000-01-14 | Fracture | 2503.50 | 2509.00 | 0 |
For data sources see[4]