X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184113216C20

Well Details

Well ID: 0184113216C20
Loading map...
Location: C2/16-32-018-11W4/0
Location Alias: C2/16-32-18-11 W4M
Location Alias 2: C2/16-32-018-11 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 11
Section: 32
County/Municipality: County of Newell
Well Name: Imaginea PRIN 16-32-18-11
Operator Name: Cor4 Oil Corp.
License Number: 0072783
License Date: 1978-11-03
License Status: Abandoned
Spud Date: 1978-11-21
Final Drill Date: 1978-11-27
Well Total Depth: 1029.00 m
Surface Hole Latitude: 50.571028
Surface Hole Longitude: -111.475250

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-03 Obtained License
1978-11-27 Finished Drilling
1978-11-28 Production Casing Operation Performed
1978-11-28 Well Mode changed to Drilled and Cased
1978-12-22 Perforation Treatment Performed - Jet Perforation
1979-01-01 Well Began Production
1979-01-01 Well Fluid changed to Crude Oil
1979-01-01 Well Mode changed to Pumping
1979-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-01 Well Fluid changed to Crude Oil
1996-01-01 Well Mode changed to Suspended
1998-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-17 Plug Back Performed
1998-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-30 Perforation Treatment Performed - Cement Plug
1998-11-30 Perforation Treatment Performed - Jet Perforation
1998-12-01 Perforation Treatment Performed - Cement Plug
1998-12-01 Perforation Treatment Performed - Jet Perforation
1998-12-03 Well Abandoned
1998-12-03 Well Fluid changed to Crude Oil
1998-12-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-22 Perforation 1007.50 1011.50 13
1998-12-01 Cement Plug 215.00 237.00 0
1998-12-01 Perforation 207.00 208.00 14
1998-12-01 Cement Plug 168.00 208.00 0
1979-01-05 Acid Treatment 1007.50 1011.50 0
1979-01-07 Acid Treatment 1007.50 1011.50 0
1998-11-17 Packing Device Capped w/Cement 992.00 1000.00 0
1998-11-30 Perforation 329.00 330.00 14
1998-11-30 Acid Treatment 329.00 330.00 0
1998-11-30 Packing Device Capped w/Cement 329.00 330.00 0
1998-11-30 Cement Plug 274.00 334.00 0
1998-12-01 Perforation 234.00 235.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4233 0.0 0.0 0.0
1980 8687 0.0 0.0 0.0
1981 8448 0.0 0.0 0.0
1982 5654 0.0 0.0 0.0
1983 7032 0.0 0.0 0.0
1984 7138 0.0 0.0 0.0
1985 8058 0.0 0.0 0.0
1986 5480 0.0 0.0 0.0
1987 7978 0.0 0.0 0.0
1988 6997 0.0 0.0 0.0
1989 7062 0.0 0.0 0.0
1990 7807 0.0 0.0 0.0
1991 7844 0.0 0.0 0.0
1992 2088 0.0 0.0 0.0

For data sources see[5]

References