If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0184133016040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.537145,"lon":-111.774351,"icon":""}]} |
| Location: 04/16-30-018-13W4/0 | |
| Location Alias: 04/16-30-18-13 W4M | |
| Location Alias 2: 04/16-30-018-13 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 018 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 30 | |
| County/Municipality: County of Newell | |
| Well Name: CARDINAL 104 HZ BANTRY 16-30-18-13 | |
| Operator Name: Cardinal Energy Ltd. | |
| License Number: 0474690 | |
| License Date: 2015-02-23 | |
| License Status: Issued | |
| Spud Date: 2015-05-09 | |
| Final Drill Date: 2015-05-17 | |
| Well Total Depth: 2905.00 m | |
| Surface Hole Latitude: 50.537145 | |
| Surface Hole Longitude: -111.774351 |
| Date | Event |
|---|---|
| 2015-02-23 | Obtained License |
| 2015-05-10 | Surface Casing Operation Performed |
| 2015-05-11 | Direction Drilling Operation Performed - Deviate |
| 2015-05-12 | Direction Drilling Operation Performed - Horizontal |
| 2015-05-12 | Well Log Performed |
| 2015-05-13 | Intermediate Casing Operation Performed |
| 2015-05-17 | Finished Drilling |
| 2015-05-17 | Well Log Performed |
| 2015-05-17 | Well Mode changed to Drilled and Cased |
| 2015-05-18 | Liner Casing Operation Performed |
| 2015-05-18 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-05-19 | Rig Released |
| 2015-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-06-03 | Well Began Production |
| 2015-06-03 | Well Fluid changed to Crude Oil |
| 2015-06-03 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-05-09 | Bonanza Drilling Inc. | 4 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-05-11 | 748.20 | Deviate (5 - 79 degrees) |
| 2015-05-12 | 1125.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-05-18 | Open Hole/Barefoot Completion | 2895.00 | 2905.00 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 2212.80 | 2213.60 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 2140.90 | 2141.80 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 2057.30 | 2058.10 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1985.00 | 1985.90 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1912.80 | 1913.60 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1840.50 | 1841.40 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1768.30 | 1769.10 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1696.10 | 1696.90 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1623.80 | 1624.60 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1551.50 | 1552.40 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2874.20 | 2875.50 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1479.30 | 1480.10 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1405.20 | 1406.10 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1325.20 | 1326.10 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1255.90 | 1256.70 | 0 |
| 2015-05-30 | Multi-Stage Fracture | 1186.40 | 1187.20 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2796.60 | 2797.40 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2713.30 | 2714.10 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2630.60 | 2631.40 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2559.20 | 2560.10 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2475.60 | 2476.40 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2392.00 | 2392.80 | 0 |
| 2015-05-29 | Multi-Stage Fracture | 2284.60 | 2285.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-05-29 | 2015-05-30 | 1,004 | 1,481 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 64.1931 | N/A | |||
| Sand (20/40) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 25.1252 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 25.1252 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 25.1252 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 25.1253 | N/A | ||||
| Yukon Black (16/30) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 5.0156 | N/A | ||
| Furfuryl Alcohol | 98-00-0 | 100 | 5.0156 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.015 | N/A | |
| Water | 7732-18-5 | 100 | 0.015 | N/A | ||||
| CAN-2300 Breaker (Enzyme HpH. 10L:1L) | Canyon | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0455 | N/A | |
| Water | 7732-18-5 | 100 | 0.0455 | N/A | ||||
| CAN-2301 Breaker (Oxidizer) | Canyon | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0444 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.0444 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1076 | N/A | |
| Water | 7732-18-5 | 100 | 0.1076 | N/A | ||||
| CAN-2200 Crosslinker / pH buffer (Borate) | Canyon | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1741 | N/A | |
| Monoethanolamine | 141-43-5 | 100 | 0.1741 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.1741 | N/A | ||||
| Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.8754 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 4.8754 | N/A | ||||
| CAN-2000 Gellant (Guar) | Canyon | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.3374 | N/A | |
| CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0662 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0662 | N/A | ||||
| Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0662 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0662 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-05-23 | 2015-05-25 | Municipal Water | 650 |
| 2015-05-24 | 2015-05-25 | Municipal Water | 885 |
| 2015-05-24 | 2015-05-24 | Municipal Water | 35 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 4060 | 0.0 | 0.0 | 0.0 |
| 2016 | 8221 | 0.0 | 0.0 | 0.0 |
| 2017 | 8534 | 0.0 | 0.0 | 0.0 |
| 2018 | 7584 | 0.0 | 0.0 | 0.0 |
| 2019 | 8568 | 0.0 | 0.0 | 0.0 |
| 2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-05-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]