X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184141506000

Well Details

Well ID: 0184141506000
Loading map...
Location: 00/06-15-018-14W4/0
Location Alias: 00/06-15-18-14 W4M
Location Alias 2: 00/06-15-018-14 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 14
Section: 15
County/Municipality: County of Newell
Well Name: GPNG NEWELL 6-15-18-14
Operator Name: Prospect Oil & Gas Management Ltd.
License Number: 0066248
License Date: 1977-10-20
License Status: Issued
Spud Date: 1977-10-30
Final Drill Date: 1977-11-01
Well Total Depth: 571.50 m
Surface Hole Latitude: 50.518699
Surface Hole Longitude: -111.851475

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-20 Obtained License
1977-11-01 Finished Drilling
1977-11-02 Production Casing Operation Performed
1977-11-11 Perforation Treatment Performed - Jet Perforation
1977-11-11 Perforation Treatment Performed - Selective Jet Perforations
1977-11-12 Perforation Treatment Performed - Fractured
1977-11-13 Perforation Treatment Performed - Bullet Perforation
1977-11-13 Perforation Treatment Performed - Fractured
1977-11-13 Perforation Treatment Performed - Selective Bullet Perforations
1978-06-20 Well Mode changed to Drilled and Cased
1980-01-03 Well Began Production
1980-01-03 Well Fluid changed to Gas
1980-01-03 Well Mode changed to Flowing
1981-09-01 Well Fluid changed to Gas
1981-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-11 Selective Jet Perforations 435.60 436.20 0
1977-11-12 Fracture 435.60 555.30 0
1977-11-13 Selective Bullet Perforations 316.10 325.80 0
1977-11-13 Bullet Perforation 317.00 317.30 3
1977-11-13 Bullet Perforation 322.50 322.80 3
1977-11-13 Bullet Perforation 330.10 330.40 3
1977-11-13 Selective Bullet Perforations 335.90 335.90 0
1977-11-13 Selective Bullet Perforations 336.50 337.40 0
1977-11-13 Selective Bullet Perforations 348.40 349.30 0
1977-11-13 Bullet Perforation 358.70 359.10 3
1977-11-13 Bullet Perforation 377.30 377.60 3
1977-11-11 Perforation 437.10 438.30 7
1977-11-13 Bullet Perforation 378.30 379.80 3
1977-11-13 Bullet Perforation 380.40 380.70 3
1977-11-13 Selective Bullet Perforations 382.50 383.70 0
1977-11-13 Selective Bullet Perforations 388.30 390.80 0
1977-11-13 Fracture 316.10 390.80 0
1977-11-11 Perforation 443.20 443.50 3
1977-11-11 Perforation 445.90 446.20 3
1977-11-11 Selective Jet Perforations 447.80 456.90 0
1977-11-11 Perforation 454.80 455.70 3
1977-11-11 Selective Jet Perforations 457.50 485.20 0
1977-11-11 Perforation 460.90 461.50 3
1977-11-11 Selective Jet Perforations 555.30 555.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 6511 0.0 0.0 0.0
1981 5813 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 7382 0.0 0.0 0.0
1984 8449 0.0 0.0 0.0
1985 8353 0.0 0.0 0.0
1986 8015 0.0 0.0 0.0
1987 8283 0.0 0.0 0.0
1988 8006 0.0 0.0 0.0
1989 8693 0.0 0.0 0.0
1990 7165 0.0 0.0 0.0
1991 8180 0.0 0.0 0.0
1992 8684 0.0 0.0 0.0
1993 8667 0.0 0.0 0.0
1994 8318 0.0 0.0 0.0
1995 8751 0.0 0.0 0.0
1996 8691 0.0 0.0 0.0
1997 8228 0.0 0.0 0.0
1998 8749 0.0 0.0 0.0
1999 8715 0.0 0.0 0.0
2000 8182 0.0 0.0 0.0
2001 8615 0.0 0.0 0.0
2002 8552 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 8541 0.0 0.0 0.0
2005 7793 0.0 0.0 0.0
2006 8657 0.0 0.0 0.0
2007 8755 0.0 0.0 0.0
2008 8685 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References