X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184141608020

Well Details

Well ID: 0184141608020
Loading map...
Location: 02/08-16-018-14W4/0
Location Alias: 02/08-16-18-14 W4M
Location Alias 2: 02/08-16-018-14 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 14
Section: 16
County/Municipality: County of Newell
Well Name: GPNG NEWELL 8-16-18-14
Operator Name: Prospect Oil & Gas Management Ltd.
License Number: 0096574
License Date: 1982-07-06
License Status: Issued
Spud Date: 1982-09-22
Final Drill Date: 1982-09-23
Well Total Depth: 524.00 m
Surface Hole Latitude: 50.521079
Surface Hole Longitude: -111.863598

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-06 Obtained License
1982-09-23 Finished Drilling
1982-09-24 Production Casing Operation Performed
1982-10-13 Perforation Treatment Performed - Fractured
1982-10-13 Perforation Treatment Performed - Selective Bullet Perforations
1982-10-14 Perforation Treatment Performed - Fractured
1982-10-14 Perforation Treatment Performed - Selective Bullet Perforations
1982-10-14 Well Mode changed to Drilled and Cased
1983-08-01 Well Began Production
1983-08-01 Well Fluid changed to Gas
1983-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-13 Selective Bullet Perforations 482.50 483.50 0
1982-10-13 Selective Bullet Perforations 452.50 452.70 0
1982-10-13 Selective Bullet Perforations 452.20 452.40 0
1982-10-13 Selective Bullet Perforations 443.80 444.00 0
1982-10-13 Selective Bullet Perforations 436.00 443.60 0
1982-10-13 Selective Bullet Perforations 434.90 435.40 0
1982-10-13 Selective Bullet Perforations 434.50 434.70 0
1982-10-13 Selective Bullet Perforations 433.40 433.60 0
1982-10-13 Fracture 433.40 483.50 0
1982-10-14 Selective Bullet Perforations 377.30 377.60 0
1982-10-14 Selective Bullet Perforations 376.70 377.00 0
1982-10-13 Selective Bullet Perforations 458.80 482.00 0
1982-10-14 Selective Bullet Perforations 375.80 376.20 0
1982-10-14 Selective Bullet Perforations 374.40 375.40 0
1982-10-14 Selective Bullet Perforations 357.40 358.00 0
1982-10-14 Selective Bullet Perforations 356.80 357.10 0
1982-10-14 Selective Bullet Perforations 356.30 356.60 0
1982-10-14 Selective Bullet Perforations 354.80 355.30 0
1982-10-14 Selective Bullet Perforations 343.40 343.60 0
1982-10-14 Selective Bullet Perforations 334.70 343.10 0
1982-10-14 Selective Bullet Perforations 333.20 333.80 0
1982-10-14 Selective Bullet Perforations 332.00 332.80 0
1982-10-13 Selective Bullet Perforations 458.20 458.60 0
1982-10-14 Selective Bullet Perforations 327.00 327.20 0
1982-10-14 Selective Bullet Perforations 326.20 326.50 0
1982-10-14 Selective Bullet Perforations 320.70 325.60 0
1982-10-14 Selective Bullet Perforations 319.80 320.50 0
1982-10-14 Selective Bullet Perforations 318.90 319.40 0
1982-10-14 Selective Bullet Perforations 316.60 317.70 0
1982-10-14 Selective Bullet Perforations 313.30 326.50 0
1982-10-14 Selective Bullet Perforations 312.60 313.10 0
1982-10-14 Selective Bullet Perforations 311.80 311.80 0
1982-10-14 Fracture 311.80 377.60 0
1982-10-13 Selective Bullet Perforations 457.90 458.00 0
1982-10-13 Selective Bullet Perforations 457.70 457.80 0
1982-10-13 Selective Bullet Perforations 454.70 454.90 0
1982-10-13 Selective Bullet Perforations 453.90 454.50 0
1982-10-13 Selective Bullet Perforations 453.50 453.70 0
1982-10-13 Selective Bullet Perforations 452.90 453.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3592 0.0 0.0 0.0
1984 8426 0.0 0.0 0.0
1985 8402 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8397 0.0 0.0 0.0
1988 8671 0.0 0.0 0.0
1989 7238 0.0 0.0 0.0
1990 6377 0.0 0.0 0.0
1991 8552 0.0 0.0 0.0
1992 8686 0.0 0.0 0.0
1993 8660 0.0 0.0 0.0
1994 8318 0.0 0.0 0.0
1995 8754 0.0 0.0 0.0
1996 8691 0.0 0.0 0.0
1997 8228 0.0 0.0 0.0
1998 8749 0.0 0.0 0.0
1999 8715 0.0 0.0 0.0
2000 8182 0.0 0.0 0.0
2001 8615 0.0 0.0 0.0
2002 8552 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 8541 0.0 0.0 0.0
2005 7793 0.0 0.0 0.0
2006 8657 0.0 0.0 0.0
2007 8755 0.0 0.0 0.0
2008 8685 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8015 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 6575 0.0 0.0 0.0
2017 2208 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References