X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184142316002

Well Details

Well ID: 0184142316002
Loading map...
Location: 00/16-23-018-14W4/2
Location Alias: 00/16-23-18-14 W4M
Location Alias 2: 00/16-23-018-14 W4/02
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 14
Section: 23
County/Municipality: County of Newell
Well Name: GPNG BANTRY 16-23-18-14
Operator Name: Prospect Oil & Gas Management Ltd.
License Number: 0066516
License Date: 1977-11-03
License Status: Issued
Spud Date: 1977-11-08
Final Drill Date: 1977-11-09
Well Total Depth: 515.10 m
Surface Hole Latitude: 50.541906
Surface Hole Longitude: -111.815027

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-03 Obtained License
1977-11-09 Finished Drilling
1977-11-09 Production Casing Operation Performed
1977-11-12 Perforation Treatment Performed - Fractured
1977-11-12 Perforation Treatment Performed - Jet Perforation
1977-11-12 Perforation Treatment Performed - Selective Jet Perforations
1977-11-14 Perforation Treatment Performed - Bullet Perforation
1977-11-14 Perforation Treatment Performed - Fractured
1977-11-14 Perforation Treatment Performed - Selective Bullet Perforations
1978-06-20 Well Mode changed to Drilled and Cased
1980-01-03 Well Began Production
1980-01-03 Well Fluid changed to Gas
1980-01-03 Well Mode changed to Flowing
1981-09-01 Well Structure changed to Commingled
2010-02-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-12 Perforation 452.60 454.50 3
1977-11-12 Fracture 452.60 480.70 0
1977-11-14 Selective Bullet Perforations 325.80 326.70 0
1977-11-14 Bullet Perforation 327.10 327.70 3
1977-11-14 Bullet Perforation 332.50 332.80 3
1977-11-14 Bullet Perforation 338.00 338.90 3
1977-11-14 Selective Bullet Perforations 343.80 351.70 0
1977-11-14 Bullet Perforation 351.70 352.00 3
1977-11-14 Bullet Perforation 360.00 360.60 3
1977-11-14 Bullet Perforation 361.20 361.80 3
1977-11-14 Bullet Perforation 373.10 374.30 3
1977-11-12 Perforation 459.30 459.60 3
1977-11-14 Selective Bullet Perforations 375.20 381.00 0
1977-11-14 Bullet Perforation 381.00 381.30 3
1977-11-14 Bullet Perforation 390.80 391.40 7
1977-11-14 Bullet Perforation 392.00 393.50 7
1977-11-14 Bullet Perforation 395.00 395.30 3
1977-11-14 Bullet Perforation 398.10 398.40 3
1977-11-14 Selective Bullet Perforations 407.20 407.20 0
1977-11-14 Fracture 325.80 407.20 0
2010-02-26 Perforation 256.00 258.00 13
2010-02-26 Perforation 259.50 260.50 13
1977-11-12 Perforation 461.20 461.80 3
2010-02-26 Perforation 234.00 239.00 13
1977-11-12 Selective Jet Perforations 463.00 463.60 0
1977-11-12 Selective Jet Perforations 464.80 471.20 0
1977-11-12 Selective Jet Perforations 471.50 471.80 0
1977-11-12 Selective Jet Perforations 474.00 474.30 0
1977-11-12 Selective Jet Perforations 476.40 476.70 0
1977-11-12 Selective Jet Perforations 477.00 480.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 5136 0.0 0.0 0.0
1981 3629 0.0 0.0 0.0

For data sources see[5]

References