If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0184182104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.530259,"lon":-112.429924,"icon":""}]} |
| Location: 00/04-21-018-18W4/0 | |
| Location Alias: 00/04-21-18-18 W4M | |
| Location Alias 2: 00/04-21-018-18 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 018 | |
| Meridian: 4 | |
| Range: 18 | |
| Section: 21 | |
| County/Municipality: Vulcan County | |
| Well Name: CO-MAXX CODY EYREMORE 4-21-18-18 | |
| Operator Name: Husky Oil Operations Limited | |
| License Number: 0005608 | |
| License Date: 1952-11-07 | |
| License Status: RecCertified | |
| Spud Date: 1952-11-15 | |
| Final Drill Date: 1953-02-14 | |
| Well Total Depth: 1658.10 m | |
| Surface Hole Latitude: 50.530259 | |
| Surface Hole Longitude: -112.429924 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-11-07 | Obtained License |
| 1952-11-26 | Drill Stem Test Performed |
| 1952-11-27 | Drill Stem Test Performed |
| 1952-11-28 | Drill Stem Test Performed |
| 1952-11-29 | Drill Stem Test Performed |
| 1952-12-01 | Drill Stem Test Performed |
| 1952-12-02 | Drill Stem Test Performed |
| 1952-12-03 | Drill Stem Test Performed |
| 1953-01-11 | Drill Stem Test Performed |
| 1953-01-14 | Production Casing Operation Performed |
| 1953-01-18 | Drill Stem Test Performed |
| 1953-02-01 | Drill Stem Test Performed |
| 1953-02-03 | Drill Stem Test Performed |
| 1953-02-11 | Drill Stem Test Performed |
| 1953-02-13 | Drill Stem Test Performed |
| 1953-02-14 | Finished Drilling |
| 1953-02-14 | Perforation Treatment Performed - Open-Hole Completion |
| 1953-02-20 | Perforation Treatment Performed - Bullet Perforation |
| 1953-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-02-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1953-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-03-04 | Perforation Treatment Performed - Fractured |
| 1953-03-24 | Well Mode changed to Drilled and Cased |
| 1953-09-01 | Perforation Treatment Performed - Cement Plug |
| 1953-09-21 | Perforation Treatment Performed - Bullet Perforation |
| 1953-10-01 | Perforation Treatment Performed - Cement Squeeze |
| 1953-10-06 | Perforation Treatment Performed - Jet Perforation |
| 1953-12-04 | Drill Stem Test Performed |
| 1953-12-11 | Drill Stem Test Performed |
| 1953-12-12 | Drill Stem Test Performed |
| 1983-06-10 | Perforation Treatment Performed - Jet Perforation |
| 1983-06-11 | Perforation Treatment Performed - Cement Squeeze |
| 1997-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-09-08 | Perforation Treatment Performed - Jet Perforation |
| 1997-09-08 | Perforation Treatment Performed - Remedial Casing |
| 1997-09-08 | Plug Back Performed |
| 1997-09-08 | Well Log Performed |
| 1997-09-09 | Well Fluid changed to Gas |
| 1997-09-09 | Well Mode changed to Testing |
| 1997-09-10 | Well Abandoned |
| 1997-09-10 | Well Fluid changed to Gas |
| 1997-09-10 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1953-02-14 | Open Hole/Barefoot Completion | 1456.60 | 1469.10 | 0 |
| 1953-09-21 | Bullet Perforation | 966.50 | 969.60 | 13 |
| 1953-10-01 | Cement Squeeze | 963.20 | 969.60 | 0 |
| 1953-10-06 | Perforation | 967.70 | 970.80 | 10 |
| 1983-06-10 | Perforation | 903.00 | 904.00 | 13 |
| 1983-06-11 | Cement Squeeze | 903.00 | 904.00 | 0 |
| 1997-09-08 | Packing Device Capped w/Cement | 953.00 | 961.00 | 0 |
| 1997-09-08 | Perforation | 304.00 | 305.00 | 14 |
| 1997-09-08 | Remedial Casing Cementing | 304.00 | 305.00 | 0 |
| 1997-09-08 | Packing Device Capped w/Cement | 300.00 | 300.00 | 0 |
| 1953-02-20 | Bullet Perforation | 1456.60 | 1463.00 | 13 |
| 1953-02-23 | Acid Wash | 1456.60 | 1469.10 | 0 |
| 1953-02-23 | Acid Treatment | 1456.60 | 1469.10 | 0 |
| 1953-02-25 | Acid Treatment | 1456.60 | 1469.10 | 0 |
| 1953-02-27 | Acid Treatment | 1456.60 | 1469.10 | 0 |
| 1953-03-04 | Fracture | 1456.60 | 1469.10 | 0 |
| 1953-09-01 | Cement Plug | 1432.60 | 1469.10 | 0 |
| 1953-09-21 | Bullet Perforation | 963.20 | 963.20 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1976 | 8 | 0.0 | 0.0 | 0.0 |
| 1982 | 62 | 0.0 | 0.0 | 0.0 |
| 1983 | 128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]