X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184202102000

Well Details

Well ID: 0184202102000
Loading map...
Location: 00/02-21-018-20W4/0
Location Alias: 00/02-21-18-20 W4M
Location Alias 2: 00/02-21-018-20 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 20
Section: 21
County/Municipality: Vulcan County
Well Name: VERITY PAGEANT 2-21-18-20
Operator Name: Verity Energy Ltd.
License Number: 0154227
License Date: 1992-10-26
License Status: Abandoned
Spud Date: 1993-01-11
Final Drill Date: 1993-01-15
Well Total Depth: 1447.00 m
Surface Hole Latitude: 50.531053
Surface Hole Longitude: -112.695555

For data sources see[1][2]

Well History

Date Event
1992-10-26 Obtained License
1993-01-11 Surface Casing Operation Performed
1993-01-15 Finished Drilling
1993-01-15 Well Mode changed to Drilled and Cased
1993-01-16 Well Log Performed
1993-01-17 Production Casing Operation Performed
1993-01-17 Rig Released
1993-01-27 Perforation Treatment Performed - Jet Perforation
1993-06-28 Well Began Production
1993-06-28 Well Fluid changed to Gas
1993-06-28 Well Mode changed to Flowing
1995-08-31 Well Fluid changed to Gas
1995-08-31 Well Mode changed to Suspended
1997-03-19 Well Fluid changed to Gas
1997-03-19 Well Mode changed to Flowing
2002-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-15 Perforation Treatment Performed - Jet Perforation
2002-01-15 Plug Back Performed
2002-01-15 Well Fluid changed to Gas
2002-01-15 Well Mode changed to Suspended
2002-01-16 Well Fluid changed to Gas
2002-01-16 Well Mode changed to Abandoned Zone
2002-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-10 Plug Back Performed
2002-04-11 Perforation Treatment Performed - Jet Perforation
2018-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-22 Plug Back Performed
2018-06-22 Well Log Performed
2018-07-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-27 Perforation 1391.00 1393.00 14
2018-06-22 Packing Device Capped w/Cement 1140.00 1148.00 0
1993-01-27 Perforation 1396.40 1398.00 14
1993-01-27 Perforation 1400.40 1400.80 14
1993-01-27 Perforation 1401.20 1401.80 14
1993-01-27 Perforation 1403.50 1405.00 14
2002-01-15 Packing Device Capped w/Cement 1375.00 1383.00 0
2002-01-15 Perforation 1217.00 1220.00 17
2002-04-10 Packing Device Capped w/Cement 1196.00 1204.00 0
2002-04-11 Perforation 1156.00 1160.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4269 0.0 0.0 0.0
1994 8290 0.0 0.0 0.0
1995 5226 0.0 0.0 0.0
1997 4887 0.0 0.0 0.0
1998 8175 0.0 0.0 0.0
1999 7716 0.0 0.0 0.0
2000 6719 0.0 0.0 0.0
2001 7079 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References