If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0184292703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.541759,"lon":-113.91284,"icon":""}]} |
Location: 00/03-27-018-29W4/0 | |
Location Alias: 00/03-27-18-29 W4M | |
Location Alias 2: 00/03-27-018-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 018 | |
Meridian: 4 | |
Range: 29 | |
Section: 27 | |
County/Municipality: Foothills County | |
Well Name: EMC HIGH RIVER 3-27-18-29 | |
Operator Name: Bighorn Energy Corporation | |
License Number: 0269338 | |
License Date: 2002-04-15 | |
License Status: Suspension | |
Spud Date: 2002-06-15 | |
Final Drill Date: 2002-07-12 | |
Well Total Depth: 2597.50 m | |
Surface Hole Latitude: 50.541759 | |
Surface Hole Longitude: -113.912840 |
Date | Event |
---|---|
2002-04-15 | Obtained License |
2002-06-17 | Surface Casing Operation Performed |
2002-06-23 | Direction Drilling Operation Performed - Deviate |
2002-07-12 | Finished Drilling |
2002-07-12 | Well Log Performed |
2002-07-13 | Well Log Performed |
2002-07-15 | Production Casing Operation Performed |
2002-07-17 | Rig Released |
2002-07-17 | Well Mode changed to Drilled and Cased |
2002-08-19 | Perforation Treatment Performed - Chemical Squeeze |
2002-08-19 | Perforation Treatment Performed - Jet Perforation |
2003-02-01 | Well Fluid changed to Gas |
2003-02-01 | Well Mode changed to Testing |
2004-02-01 | Well Began Production |
2004-02-01 | Well Fluid changed to Gas |
2004-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2002-06-23 | 1495.70 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-08-19 | Perforation | 2563.50 | 2568.00 | 17 |
2002-08-19 | Chemical Squeeze | 2563.50 | 2568.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 6258 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8670 | 0.0 | 0.0 | 0.0 |
2007 | 7981 | 0.0 | 0.0 | 0.0 |
2008 | 8742 | 0.0 | 0.0 | 0.0 |
2009 | 8701 | 0.0 | 0.0 | 0.0 |
2010 | 8495 | 0.0 | 0.0 | 0.0 |
2011 | 8217 | 0.0 | 0.0 | 0.0 |
2012 | 8479 | 0.0 | 0.0 | 0.0 |
2013 | 6992 | 0.0 | 0.0 | 0.0 |
2014 | 8413 | 0.0 | 0.0 | 0.0 |
2015 | 5493 | 0.0 | 0.0 | 0.0 |
2016 | 2416 | 0.0 | 0.0 | 0.0 |
For data sources see[6]