If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0184302501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.544681,"lon":-113.991535,"icon":""}]} |
| Location: 00/01-25-018-30W4/0 | |
| Location Alias: 00/01-25-18-30 W4M | |
| Location Alias 2: 00/01-25-018-30 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 018 | |
| Meridian: 4 | |
| Range: 30 | |
| Section: 25 | |
| County/Municipality: Foothills County | |
| Well Name: TEXACO C&E HIGH RIVER A-1-25 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: 0011876 | |
| License Date: 1956-07-18 | |
| License Status: Re-Entered | |
| Spud Date: 1956-07-31 | |
| Final Drill Date: 1956-11-15 | |
| Well Total Depth: 3058.10 m | |
| Surface Hole Latitude: 50.544681 | |
| Surface Hole Longitude: -113.991535 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1956-07-18 | Obtained License |
| 1956-09-21 | Drill Stem Test Performed |
| 1956-09-23 | Drill Stem Test Performed |
| 1956-09-26 | Drill Stem Test Performed |
| 1956-09-28 | Drill Stem Test Performed |
| 1956-10-09 | Drill Stem Test Performed |
| 1956-10-10 | Drill Stem Test Performed |
| 1956-11-02 | Drill Stem Test Performed |
| 1956-11-10 | Drill Stem Test Performed |
| 1956-11-15 | Finished Drilling |
| 1956-11-15 | Production Casing Operation Performed |
| 1956-11-15 | Well Mode changed to Drilled and Cased |
| 1956-11-16 | Perforation Treatment Performed - Bullet Perforation |
| 1956-11-23 | Perforation Treatment Performed - Jet Perforation |
| 1956-11-25 | Perforation Treatment Performed - Jet Perforation |
| 1956-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-11-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-11-30 | Perforation Treatment Performed - Jet Perforation |
| 1956-12-01 | Perforation Treatment Performed - Cement Plug |
| 1956-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-12-03 | Perforation Treatment Performed - Jet Perforation |
| 1956-12-08 | Perforation Treatment Performed - Cement Squeeze |
| 1956-12-10 | Perforation Treatment Performed - Bullet Perforation |
| 1956-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-12-13 | Perforation Treatment Performed - Cement Squeeze |
| 1956-12-16 | Perforation Treatment Performed - Jet Perforation |
| 1956-12-17 | Well Began Production |
| 1956-12-17 | Well Fluid changed to Crude Oil |
| 1956-12-17 | Well Mode changed to Flowing |
| 1971-07-19 | Perforation Treatment Performed - Cement Plug |
| 1971-07-19 | Well Fluid changed to Crude Oil |
| 1971-07-19 | Well Mode changed to Abandoned |
| 1971-07-20 | Well Abandoned |
| 1971-07-20 | Well Fluid changed to Crude Oil |
| 1971-07-20 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1956-11-16 | Bullet Perforation | 3025.70 | 3028.80 | 0 |
| 1956-12-03 | Acid Treatment | 2526.80 | 2540.50 | 0 |
| 1956-12-08 | Cement Squeeze | 2526.80 | 2540.50 | 0 |
| 1956-12-10 | Bullet Perforation | 2532.90 | 2542.00 | 20 |
| 1956-12-11 | Acid Treatment | 2532.90 | 2542.00 | 0 |
| 1956-12-12 | Acid Treatment | 2532.90 | 2542.00 | 0 |
| 1956-12-13 | Cement Squeeze | 2532.90 | 2542.00 | 0 |
| 1956-12-16 | Perforation | 2933.70 | 2937.70 | 13 |
| 1971-07-19 | Cement Plug | 2909.10 | 2930.20 | 0 |
| 1956-11-23 | Perforation | 3026.70 | 3029.70 | 26 |
| 1956-11-25 | Perforation | 3026.70 | 3029.70 | 26 |
| 1956-11-27 | Acid Treatment | 3025.70 | 3029.70 | 0 |
| 1956-11-28 | Acid Treatment | 3025.70 | 3029.70 | 0 |
| 1956-11-30 | Perforation | 3008.40 | 3021.20 | 13 |
| 1956-11-30 | Acid Treatment | 3008.40 | 3021.20 | 0 |
| 1956-12-01 | Cement Plug | 2956.60 | 2987.00 | 0 |
| 1956-12-03 | Perforation | 2526.80 | 2540.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 408 | 0.0 | 0.0 | 0.0 |
| 1969 | 2448 | 0.0 | 0.0 | 0.0 |
| 1970 | 2520 | 0.0 | 0.0 | 0.0 |
| 1971 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]