If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0185023315022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.569587,"lon":-114.21395,"icon":""}]} |
Location: 02/15-33-018-02W5/2 | |
Location Alias: 02/15-33-18-02 W5M | |
Location Alias 2: 02/15-33-018-02 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 018 | |
Meridian: 5 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Foothills County | |
Well Name: CPEC 102 TV 15-33-18-2 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0066777 | |
License Date: 1977-11-17 | |
License Status: Issued | |
Spud Date: 1977-11-27 | |
Final Drill Date: 1977-12-20 | |
Well Total Depth: 1564.50 m | |
Surface Hole Latitude: 50.569587 | |
Surface Hole Longitude: -114.213950 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-11-17 | Obtained License |
1977-12-02 | Lost Circulation Occurred |
1977-12-20 | Finished Drilling |
1977-12-21 | Drill Stem Test Performed |
1977-12-23 | Drill Stem Test Performed |
1977-12-24 | Production Casing Operation Performed |
1978-01-13 | Perforation Treatment Performed - Jet Perforation |
1978-01-14 | Perforation Treatment Performed - Fractured |
1978-01-19 | Perforation Treatment Performed - Jet Perforation |
1978-01-20 | Perforation Treatment Performed - Fractured |
1978-04-01 | Well Mode changed to Drilled and Cased |
1980-11-19 | Well Began Production |
1980-11-19 | Well Fluid changed to Gas |
1980-11-19 | Well Mode changed to Flowing |
1983-09-21 | Perforation Treatment Performed - Cement Squeeze |
1983-09-24 | Perforation Treatment Performed - Cement Squeeze |
1983-09-27 | Perforation Treatment Performed - Jet Perforation |
1983-09-27 | Well Fluid changed to Gas |
1983-09-27 | Well Mode changed to Abandoned Zone |
1983-09-28 | Perforation Treatment Performed - Jet Perforation |
1983-10-02 | Perforation Treatment Performed - Fractured |
1983-10-12 | Well Log Performed |
1983-10-14 | Perforation Treatment Performed - Jet Perforation |
1984-04-19 | Perforation Treatment Performed - Cement Squeeze |
1984-04-23 | Well Log Performed |
1984-04-24 | Perforation Treatment Performed - Jet Perforation |
1984-05-01 | Perforation Treatment Performed - Fractured |
2003-12-05 | Perforation Treatment Performed - Jet Perforation |
2003-12-05 | Well Log Performed |
2003-12-08 | Perforation Treatment Performed - Jet Perforation |
2003-12-09 | Perforation Treatment Performed - Fractured |
2003-12-10 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-01-13 | Perforation | 1111.30 | 1113.10 | 13 |
1983-09-24 | Cement Squeeze | 1111.30 | 1139.30 | 0 |
1983-09-27 | Perforation | 1405.40 | 1407.80 | 13 |
1983-09-28 | Perforation | 1394.50 | 1397.20 | 13 |
1983-09-28 | Perforation | 1401.80 | 1403.60 | 13 |
1983-09-28 | Perforation | 1409.40 | 1411.80 | 13 |
1983-10-02 | Fracture | 1394.50 | 1411.80 | 0 |
1983-10-14 | Perforation | 1349.00 | 1351.80 | 13 |
1984-04-19 | Cement Squeeze | 1349.00 | 1351.80 | 0 |
1984-04-24 | Perforation | 1349.00 | 1351.80 | 13 |
1984-05-01 | Fracture | 1349.00 | 1351.80 | 0 |
1978-01-13 | Perforation | 1115.60 | 1118.60 | 13 |
2003-12-05 | Perforation | 1244.80 | 1248.50 | 20 |
2003-12-05 | Perforation | 1004.00 | 1008.00 | 20 |
2003-12-08 | Perforation | 1282.00 | 1286.00 | 20 |
2003-12-09 | Fracture | 1282.00 | 1286.00 | 0 |
2003-12-10 | Fracture | 1004.00 | 1008.00 | 0 |
1978-01-13 | Perforation | 1124.10 | 1124.70 | 13 |
1978-01-13 | Perforation | 1125.90 | 1132.60 | 13 |
1978-01-13 | Perforation | 1137.50 | 1139.30 | 13 |
1978-01-14 | Fracture | 1111.30 | 1139.30 | 0 |
1978-01-19 | Perforation | 977.80 | 980.20 | 13 |
1978-01-20 | Fracture | 977.80 | 980.20 | 0 |
1983-09-21 | Cement Squeeze | 977.80 | 980.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 98 | 0.0 | 0.0 | 0.0 |
1980 | 912 | 0.0 | 0.0 | 0.0 |
1981 | 7751 | 0.0 | 0.0 | 0.0 |
1982 | 7615 | 0.0 | 0.0 | 0.0 |
1983 | 5247 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-12-02 | Lost Circulation | 373.10 | 1564.50 |
For data sources see[6]