X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194100106000

Well Details

Well ID: 0194100106000
Loading map...
Location: 00/06-01-019-10W4/0
Location Alias: 00/06-01-19-10 W4M
Location Alias 2: 00/06-01-019-10 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 10
Section: 01
County/Municipality: Cypress County
Well Name: IMAGINEA PRIN 6-1-19-10
Operator Name: Cor4 Oil Corp.
License Number: 0053917
License Date: 1975-06-19
License Status: Issued
Spud Date: 1975-07-21
Final Drill Date: 1975-07-23
Well Total Depth: 666.90 m
Surface Hole Latitude: 50.578679
Surface Hole Longitude: -111.262877

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-19 Obtained License
1975-07-23 Finished Drilling
1975-07-23 Production Casing Operation Performed
1975-07-30 Perforation Treatment Performed - Jet Perforation
1975-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-19 Perforation Treatment Performed - Fractured
1975-08-19 Well Mode changed to Drilled and Cased
1976-08-18 Well Began Production
1976-08-18 Well Fluid changed to Gas
1976-08-18 Well Mode changed to Flowing
1982-08-19 Perforation Treatment Performed - Jet Perforation
1982-08-20 Perforation Treatment Performed - Fractured
1982-08-23 Perforation Treatment Performed - Fractured
1982-08-23 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-30 Perforation 643.10 646.20 10
1982-08-23 Perforation 387.20 392.10 3
1982-08-23 Fracture 350.90 392.10 0
1975-08-19 Acid Treatment 643.10 646.20 0
1975-08-19 Fracture 643.10 646.20 0
1982-08-19 Perforation 453.40 456.40 4
1982-08-19 Perforation 459.80 461.60 4
1982-08-20 Fracture 453.40 461.60 0
1982-08-23 Perforation 350.90 351.80 3
1982-08-23 Perforation 365.20 366.50 3
1982-08-23 Perforation 372.90 374.70 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2886 0.0 0.0 0.0
1977 7322 0.0 0.0 0.0
1978 6986 0.0 0.0 0.0
1979 7049 0.0 0.0 0.0
1980 6670 0.0 0.0 0.0
1981 6047 0.0 0.0 0.0
1982 4533 0.0 0.0 0.0
1983 5281 0.0 0.0 0.0
1984 5452 0.0 0.0 0.0
1985 6427 0.0 0.0 0.0
1986 4403 0.0 0.0 0.0
1987 2777 0.0 0.0 0.0
1988 3649 0.0 0.0 0.0
1989 5045 0.0 0.0 0.0
1990 7318 0.0 0.0 0.0
1991 2778 0.0 0.0 0.0
1992 7109 0.0 0.0 0.0
1993 8629 0.0 0.0 0.0
1994 8648 0.0 0.0 0.0
1995 8371 0.0 0.0 0.0
1996 8699 0.0 0.0 0.0
1997 8212 0.0 0.0 0.0
1998 8485 0.0 0.0 0.0
1999 8659 0.0 0.0 0.0
2000 8691 0.0 0.0 0.0
2001 8548 0.0 0.0 0.0
2002 8706 0.0 0.0 0.0
2003 8703 0.0 0.0 0.0
2004 8675 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8748 0.0 0.0 0.0
2007 8736 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8740 0.0 0.0 0.0
2010 8755 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8579 0.0 0.0 0.0
2013 8750 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8581 0.0 0.0 0.0
2017 8652 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References