X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194141314000

Well Details

Well ID: 0194141314000
Loading map...
Location: 00/14-13-019-14W4/0
Location Alias: 00/14-13-19-14 W4M
Location Alias 2: 00/14-13-019-14 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 14
Section: 13
County/Municipality: County of Newell
Well Name: GPNG BANTRY 14-13-19-14
Operator Name: Prospect Oil & Gas Management Ltd.
License Number: 0073197
License Date: 1978-11-28
License Status: Issued
Spud Date: 1979-06-24
Final Drill Date: 1979-06-25
Well Total Depth: 523.00 m
Surface Hole Latitude: 50.615575
Surface Hole Longitude: -111.816701

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-28 Obtained License
1979-06-25 Finished Drilling
1979-06-25 Production Casing Operation Performed
1979-06-25 Well Mode changed to Drilled and Cased
1979-11-02 Perforation Treatment Performed - Selective Bullet Perforations
1979-11-04 Perforation Treatment Performed - Fractured
1985-11-06 Perforation Treatment Performed - Selective Bullet Perforations
1985-11-07 Perforation Treatment Performed - Fractured
1985-11-07 Perforation Treatment Performed - Selective Bullet Perforations
1987-08-19 Well Began Production
1987-08-19 Well Fluid changed to Gas
1987-08-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-02 Selective Bullet Perforations 470.20 471.80 0
1985-11-07 Selective Bullet Perforations 315.90 333.30 0
1985-11-07 Selective Bullet Perforations 334.60 344.60 0
1985-11-07 Fracture 315.90 344.60 0
1979-11-02 Selective Bullet Perforations 474.70 475.70 0
1979-11-04 Fracture 470.20 475.70 0
1985-11-06 Selective Bullet Perforations 373.00 373.90 0
1985-11-06 Selective Bullet Perforations 379.70 380.30 0
1985-11-07 Fracture 373.00 380.30 0
1985-11-07 Selective Bullet Perforations 351.20 355.70 0
1985-11-07 Selective Bullet Perforations 358.50 365.60 0
1985-11-07 Fracture 351.20 365.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 3056 0.0 0.0 0.0
1988 3297 0.0 0.0 0.0
1989 8365 0.0 0.0 0.0
1990 8203 0.0 0.0 0.0
1991 7515 0.0 0.0 0.0
1992 720 0.0 0.0 0.0
1993 8584 0.0 0.0 0.0
1994 8018 0.0 0.0 0.0
1995 7822 0.0 0.0 0.0
1996 8189 0.0 0.0 0.0
1997 8340 0.0 0.0 0.0
1998 8351 0.0 0.0 0.0
1999 8638 0.0 0.0 0.0
2000 8427 0.0 0.0 0.0
2001 8443 0.0 0.0 0.0
2002 8753 0.0 0.0 0.0
2003 8449 0.0 0.0 0.0
2004 8441 0.0 0.0 0.0
2005 8582 0.0 0.0 0.0
2006 8401 0.0 0.0 0.0
2007 8376 0.0 0.0 0.0
2008 8131 0.0 0.0 0.0
2009 8521 0.0 0.0 0.0
2010 8734 0.0 0.0 0.0
2011 8733 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8709 0.0 0.0 0.0
2014 8632 0.0 0.0 0.0
2015 8741 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 6951 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References