If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0195020412002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.582367,"lon":-114.227779,"icon":""}]} |
| Location: 00/12-04-019-02W5/2 | |
| Location Alias: 00/12-04-19-02 W5M | |
| Location Alias 2: 00/12-04-019-02 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 019 | |
| Meridian: 5 | |
| Range: 02 | |
| Section: 04 | |
| County/Municipality: Foothills County | |
| Well Name: HYLO NO. 1 | |
| Operator Name: Hylo Oils Limited | |
| License Number: X0000164 | |
| License Date: 1932-01-01 | |
| License Status: RecExempt | |
| Spud Date: 1929-07-11 | |
| Final Drill Date: 1932-06-22 | |
| Well Total Depth: 1726.70 m | |
| Surface Hole Latitude: 50.582367 | |
| Surface Hole Longitude: -114.227779 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1931-10-20 | Well Mode changed to Drilled and Cased |
| 1931-12-25 | Well Fluid changed to Crude Oil |
| 1931-12-25 | Well Mode changed to Potential |
| 1931-12-26 | Well Fluid changed to Crude Oil |
| 1931-12-26 | Well Mode changed to Abandoned Zone |
| 1932-01-01 | Obtained License |
| 1932-03-09 | Production Casing Operation Performed |
| 1932-06-22 | Finished Drilling |
| 1932-06-22 | Perforation Treatment Performed - Open-Hole Completion |
| 1942-07-06 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1932-06-22 | Open Hole/Barefoot Completion | 1678.80 | 1726.70 | 0 |
| 1942-07-06 | Cement Plug | 1661.50 | 1726.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]