If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0195020502032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.576193,"lon":-114.256868,"icon":""}]} |
Location: 03/02-05-019-02W5/2 | |
Location Alias: 03/02-05-19-02 W5M | |
Location Alias 2: 03/02-05-019-02 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 5 | |
Range: 02 | |
Section: 05 | |
County/Municipality: Foothills County | |
Well Name: CPEC HERRIMAN #7 HZ TV 7-5-19-2 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0461891 | |
License Date: 2013-12-04 | |
License Status: Amended | |
Spud Date: 2014-01-03 | |
Final Drill Date: 2014-02-08 | |
Well Total Depth: 3448.00 m | |
Surface Hole Latitude: 50.576193 | |
Surface Hole Longitude: -114.256868 |
Date | Event |
---|---|
2013-12-04 | Obtained License |
2014-01-05 | Surface Casing Operation Performed |
2014-01-15 | Direction Drilling Operation Performed - Deviate |
2014-01-19 | Intermediate Casing Operation Performed |
2014-02-01 | Direction Drilling Operation Performed - Deviate |
2014-02-02 | Direction Drilling Operation Performed - Horizontal |
2014-02-08 | Finished Drilling |
2014-02-08 | Well Log Performed |
2014-02-08 | Well Structure changed to Drain |
2014-02-23 | Perforation Treatment Performed - Open-Hole Completion |
2014-02-23 | Rig Released |
2014-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-15 | 2085.40 | Deviate (5 - 79 degrees) |
2014-02-01 | 2448.80 | Deviate (5 - 79 degrees) |
2014-02-02 | 2486.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-23 | Open Hole/Barefoot Completion | 2448.80 | 3448.00 | 0 |
2014-03-14 | Acid Treatment | 2448.80 | 3448.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-02-23 | No Incident Encountered | 0.00 | 0.00 |
2014-03-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]