X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195023110000

Well Details

Well ID: 0195023110000
Loading map...
Location: 00/10-31-019-02W5/0
Location Alias: 00/10-31-19-02 W5M
Location Alias 2: 00/10-31-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 31
County/Municipality: Foothills County
Well Name: CPEC TV 10-31-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0055689
License Date: 1975-11-04
License Status: Issued
Spud Date: 1975-11-08
Final Drill Date: 1975-11-25
Well Total Depth: 1312.20 m
Surface Hole Latitude: 50.652916
Surface Hole Longitude: -114.265869

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-04 Obtained License
1975-11-25 Finished Drilling
1975-11-26 Drill Stem Test Performed
1975-11-27 Drill Stem Test Performed
1975-11-28 Drill Stem Test Performed
1975-11-29 Production Casing Operation Performed
1976-01-17 Perforation Treatment Performed - Jet Perforation
1976-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-22 Perforation Treatment Performed - Fractured
1976-01-28 Well Mode changed to Drilled and Cased
1976-07-05 Well Began Production
1976-07-05 Well Fluid changed to Gas
1976-07-05 Well Mode changed to Flowing
1986-02-01 Well Fluid changed to Gas
1986-02-01 Well Mode changed to Suspended
1991-01-14 Well Fluid changed to Gas
1991-01-14 Well Mode changed to Flowing
2003-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-15 Plug Back Performed
2003-06-15 Well Fluid changed to Gas
2003-06-15 Well Mode changed to Abandoned Zone
2003-06-16 Perforation Treatment Performed - Jet Perforation
2003-06-16 Well Log Performed
2003-06-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-17 Perforation 1254.90 1257.00 7
1976-01-17 Perforation 1259.70 1261.30 7
1976-01-17 Perforation 1264.30 1269.20 7
1976-01-21 Acid Treatment 1254.90 1269.20 0
1976-01-22 Fracture 1254.90 1269.20 0
2003-06-15 Packing Device Capped w/Cement 1241.60 1249.60 0
2003-06-16 Perforation 714.00 717.00 20
2003-06-19 Fracture 714.00 717.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2150 0.0 0.0 0.0
1977 7271 0.0 0.0 0.0
1978 6984 0.0 0.0 0.0
1979 6383 0.0 0.0 0.0
1980 7199 0.0 0.0 0.0
1981 7487 0.0 0.0 0.0
1982 8164 0.0 0.0 0.0
1983 8138 0.0 0.0 0.0
1984 7032 0.0 0.0 0.0
1985 3127 0.0 0.0 0.0
1991 5635 0.0 0.0 0.0
1992 6744 0.0 0.0 0.0
1993 7859 0.0 0.0 0.0
1994 8371 0.0 0.0 0.0
1995 8495 0.0 0.0 0.0
1996 8549 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 7601 0.0 0.0 0.0
1999 8622 0.0 0.0 0.0
2000 8780 0.0 0.0 0.0
2001 8076 0.0 0.0 0.0
2002 8545 0.0 0.0 0.0
2003 3821 0.0 0.0 0.0

For data sources see[5]

References