If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0195032511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.639339,"lon":-114.293256,"icon":""}]} |
Location: 00/11-25-019-03W5/0 | |
Location Alias: 00/11-25-19-03 W5M | |
Location Alias 2: 00/11-25-019-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 5 | |
Range: 03 | |
Section: 25 | |
County/Municipality: Foothills County | |
Well Name: CPEC HOME PACIFIC 7 TV 11-25-19-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: B0000593 | |
License Date: 1944-02-12 | |
License Status: RecCertified | |
Spud Date: 1944-04-03 | |
Final Drill Date: 1944-08-20 | |
Well Total Depth: 2267.70 m | |
Surface Hole Latitude: 50.639339 | |
Surface Hole Longitude: -114.293256 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1944-02-12 | Obtained License |
1944-08-15 | Production Casing Operation Performed |
1944-08-20 | Finished Drilling |
1944-08-20 | Perforation Treatment Performed - Open-Hole Completion |
1944-08-20 | Well Mode changed to Drilled and Cased |
1944-08-21 | Well Began Production |
1944-08-21 | Well Fluid changed to Crude Oil |
1944-08-21 | Well Mode changed to Flowing |
1944-08-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
1944-08-24 | Perforation Treatment Performed - Acid Wash - No Pressure |
1944-08-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1944-08-26 | Perforation Treatment Performed - Acid Wash - No Pressure |
1944-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1944-09-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
1944-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-11-20 | Well Began Injection |
1968-11-20 | Well Fluid changed to Gas |
1968-11-20 | Well Type changed to Injection |
1970-08-22 | Well Fluid changed to Water |
1970-08-22 | Well Type changed to Injection |
2011-10-01 | Well Fluid changed to Water |
2011-10-01 | Well Mode changed to Suspended |
2011-10-01 | Well Type changed to Injection |
2015-12-16 | Well Log Performed |
2016-11-26 | Well Log Performed |
2016-11-27 | Well Log Performed |
2016-11-28 | Well Log Performed |
2016-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-11-29 | Plug Back Performed |
2016-11-29 | Well Log Performed |
2016-11-30 | Perforation Treatment Performed - Jet Perforation |
2016-11-30 | Well Log Performed |
2016-12-01 | Perforation Treatment Performed - Cement Plug |
2016-12-01 | Perforation Treatment Performed - Cement Squeeze |
2016-12-01 | Plug Back Performed |
2016-12-02 | Well Log Performed |
2016-12-05 | Perforation Treatment Performed - Jet Perforation |
2016-12-05 | Well Log Performed |
2016-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-12-06 | Perforation Treatment Performed - Jet Perforation |
2016-12-06 | Plug Back Performed |
2016-12-06 | Well Log Performed |
2016-12-08 | Well Log Performed |
2016-12-09 | Perforation Treatment Performed - Cement Plug |
2016-12-09 | Perforation Treatment Performed - Cement Squeeze |
2016-12-09 | Plug Back Performed |
2016-12-10 | Perforation Treatment Performed - Jet Perforation |
2016-12-10 | Well Log Performed |
2016-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-12-11 | Plug Back Performed |
2016-12-11 | Well Log Performed |
2016-12-12 | Well Log Performed |
2016-12-13 | Perforation Treatment Performed - Cement Plug |
2016-12-13 | Perforation Treatment Performed - Cement Squeeze |
2016-12-13 | Perforation Treatment Performed - Jet Perforation |
2016-12-13 | Plug Back Performed |
2016-12-13 | Well Log Performed |
2016-12-14 | Perforation Treatment Performed - Jet Perforation |
2016-12-14 | Well Log Performed |
2016-12-15 | Perforation Treatment Performed - Cement Plug |
2016-12-15 | Perforation Treatment Performed - Cement Squeeze |
2016-12-15 | Plug Back Performed |
2016-12-16 | Perforation Treatment Performed - Jet Perforation |
2016-12-17 | Perforation Treatment Performed - Cement Plug |
2016-12-17 | Perforation Treatment Performed - Cement Squeeze |
2016-12-17 | Plug Back Performed |
2016-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-12-18 | Perforation Treatment Performed - Jet Perforation |
2016-12-18 | Plug Back Performed |
2016-12-18 | Well Log Performed |
2016-12-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-12-20 | Perforation Treatment Performed - Jet Perforation |
2016-12-20 | Plug Back Performed |
2016-12-20 | Well Log Performed |
2016-12-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-12-21 | Perforation Treatment Performed - Jet Perforation |
2016-12-21 | Plug Back Performed |
2016-12-21 | Well Log Performed |
2017-01-03 | Well Log Performed |
2017-01-04 | Perforation Treatment Performed - Cement Plug |
2017-01-04 | Perforation Treatment Performed - Cement Squeeze |
2017-01-04 | Plug Back Performed |
2017-01-04 | Well Fluid changed to Water |
2017-01-04 | Well Mode changed to Abandoned Zone |
2017-01-04 | Well Type changed to Injection |
2017-05-06 | Well Abandoned |
2017-05-06 | Well Fluid changed to Water |
2017-05-06 | Well Mode changed to Abandoned |
2017-05-06 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1944-08-20 | Open Hole/Barefoot Completion | 2210.70 | 2267.70 | 0 |
2016-11-30 | Perforation | 1388.00 | 1389.00 | 17 |
2016-12-01 | Cement Squeeze | 1388.00 | 1389.00 | 0 |
2016-12-01 | Cement Plug | 1371.00 | 1382.60 | 0 |
2016-12-05 | Perforation | 920.00 | 921.00 | 17 |
2016-12-05 | Perforation | 909.00 | 910.00 | 17 |
2016-12-06 | Packing Device Capped w/Cement | 897.70 | 905.70 | 0 |
2016-12-06 | Perforation | 870.00 | 871.00 | 17 |
2016-12-06 | Packing Device Capped w/Cement | 856.70 | 864.70 | 0 |
2016-12-06 | Perforation | 852.00 | 853.00 | 17 |
2016-12-09 | Cement Squeeze | 852.00 | 853.00 | 0 |
1944-08-23 | Acid Wash | 2235.70 | 2263.10 | 0 |
2016-12-09 | Cement Plug | 837.00 | 848.70 | 0 |
2016-12-10 | Perforation | 773.00 | 774.00 | 17 |
2016-12-11 | Packing Device Capped w/Cement | 757.70 | 765.70 | 0 |
2016-12-13 | Perforation | 752.00 | 753.00 | 17 |
2016-12-13 | Cement Squeeze | 752.00 | 753.00 | 0 |
2016-12-13 | Cement Plug | 722.00 | 748.70 | 0 |
2016-12-14 | Perforation | 705.00 | 706.00 | 17 |
2016-12-15 | Cement Squeeze | 705.00 | 706.00 | 0 |
2016-12-15 | Cement Plug | 693.00 | 701.70 | 0 |
2016-12-16 | Perforation | 669.00 | 670.00 | 17 |
1944-08-24 | Acid Wash | 2235.70 | 2263.10 | 0 |
2016-12-17 | Cement Squeeze | 669.00 | 670.00 | 0 |
2016-12-17 | Cement Plug | 664.00 | 665.70 | 0 |
2016-12-18 | Perforation | 610.00 | 611.00 | 17 |
2016-12-18 | Packing Device Capped w/Cement | 597.70 | 605.70 | 0 |
2016-12-18 | Perforation | 550.00 | 551.00 | 17 |
2016-12-20 | Packing Device Capped w/Cement | 538.70 | 546.70 | 0 |
2016-12-20 | Perforation | 505.00 | 506.00 | 17 |
2016-12-21 | Packing Device Capped w/Cement | 490.70 | 498.70 | 0 |
2016-12-21 | Perforation | 462.50 | 463.50 | 17 |
2016-12-21 | Perforation | 436.00 | 437.00 | 17 |
1944-08-25 | Acid Wash | 2235.70 | 2263.10 | 0 |
2017-01-04 | Cement Squeeze | 436.00 | 437.00 | 0 |
2017-01-04 | Cement Plug | 0.00 | 432.70 | 0 |
1944-08-26 | Acid Wash | 2235.70 | 2263.10 | 0 |
1944-08-31 | Acid Treatment | 2235.70 | 2263.10 | 0 |
1944-09-02 | Acid Wash | 2235.70 | 2263.10 | 0 |
1944-09-05 | Acid Treatment | 2241.80 | 2263.10 | 0 |
2016-11-29 | Packing Device Capped w/Cement | 2199.00 | 2207.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 146 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]