If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0195032609020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.646942,"lon":-114.308787,"icon":""}]} |
Location: 02/09-26-019-03W5/0 | |
Location Alias: 02/09-26-19-03 W5M | |
Location Alias 2: 02/09-26-019-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 5 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Foothills County | |
Well Name: CPEC HOWE #1 TV 9-26-19-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0305032 | |
License Date: 2004-03-02 | |
License Status: Issued | |
Spud Date: 2004-06-30 | |
Final Drill Date: 2004-08-04 | |
Well Total Depth: 3178.00 m | |
Surface Hole Latitude: 50.646942 | |
Surface Hole Longitude: -114.308787 |
Date | Event |
---|---|
2004-03-02 | Obtained License |
2004-07-03 | Surface Casing Operation Performed |
2004-07-13 | Direction Drilling Operation Performed - Horizontal |
2004-07-21 | Well Log Performed |
2004-07-22 | Intermediate Casing Operation Performed |
2004-07-22 | Well Log Performed |
2004-08-04 | Finished Drilling |
2004-08-04 | Perforation Treatment Performed - Open-Hole Completion |
2004-08-04 | Well Log Performed |
2004-08-04 | Well Structure changed to Drain |
2004-08-14 | Well Log Performed |
2004-08-17 | Rig Released |
2004-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-07-13 | 2100.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-08-04 | Open Hole/Barefoot Completion | 2545.00 | 3178.00 | 0 |
2004-11-10 | Acid Treatment | 2545.00 | 3178.00 | 0 |
For data sources see[5]