X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082112002

Well Details

Well ID: 0204082112002
Loading map...
Location: 00/12-21-020-08W4/2
Location Alias: 00/12-21-20-08 W4M
Location Alias 2: 00/12-21-020-08 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 12-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0030842
License Date: 1966-08-17
License Status: Issued
Spud Date: 1966-08-31
Final Drill Date: 1966-09-03
Well Total Depth: 985.70 m
Surface Hole Latitude: 50.712344
Surface Hole Longitude: -111.062780

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-17 Obtained License
1966-09-03 Finished Drilling
1966-09-03 Well Mode changed to Drilled and Cased
1966-09-04 Production Casing Operation Performed
1966-09-14 Perforation Treatment Performed - Bullet Perforation
1978-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-07 Perforation Treatment Performed - Cement Squeeze
1978-03-08 Perforation Treatment Performed - Jet Perforation
1978-03-08 Well Log Performed
1978-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-29 Perforation Treatment Performed - Cement Squeeze
1987-08-29 Perforation Treatment Performed - Jet Perforation
1987-08-31 Perforation Treatment Performed - Jet Perforation
1994-04-18 Perforation Treatment Performed - Cement Squeeze
1994-04-21 Perforation Treatment Performed - Jet Perforation
1994-04-21 Well Log Performed
1994-08-05 Well Began Injection
1994-08-05 Well Fluid changed to Water
1994-08-05 Well Type changed to Injection
1994-08-06 Well Fluid changed to Water
1994-08-06 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-14 Bullet Perforation 924.80 927.20 13
1994-04-18 Cement Squeeze 924.50 927.50 0
1994-04-21 Perforation 940.00 947.00 17
1978-03-07 Acid Treatment 924.80 927.20 0
1978-03-07 Cement Squeeze 924.80 927.20 0
1978-03-08 Perforation 931.80 932.10 13
1978-03-09 Acid Treatment 931.80 932.10 0
1987-08-29 Perforation 936.00 937.00 13
1987-08-29 Acid Treatment 931.80 932.10 0
1987-08-29 Cement Squeeze 931.80 937.00 0
1987-08-31 Perforation 924.50 927.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[5]

References