If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0204082113A20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.715074,"lon":-111.061756,"icon":""}]} |
| Location: A2/13-21-020-08W4/0 | |
| Location Alias: A2/13-21-20-08 W4M | |
| Location Alias 2: A2/13-21-020-08 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 020 | |
| Meridian: 4 | |
| Range: 08 | |
| Section: 21 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: CARDINAL SUFFIELD 13-21-20-8 | |
| Operator Name: Cardinal Energy Ltd. | |
| License Number: 0141247 | |
| License Date: 1989-10-11 | |
| License Status: Issued | |
| Spud Date: 1989-10-15 | |
| Final Drill Date: 1989-10-19 | |
| Well Total Depth: 933.50 m | |
| Surface Hole Latitude: 50.715074 | |
| Surface Hole Longitude: -111.061756 |
| Date | Event |
|---|---|
| 1989-10-11 | Obtained License |
| 1989-10-16 | Surface Casing Operation Performed |
| 1989-10-17 | Direction Drilling Operation Performed - Deviate |
| 1989-10-19 | Finished Drilling |
| 1989-10-19 | Well Log Performed |
| 1989-10-19 | Well Mode changed to Drilled and Cased |
| 1989-10-20 | Production Casing Operation Performed |
| 1989-10-20 | Rig Released |
| 1989-10-23 | Well Began Production |
| 1989-10-23 | Well Fluid changed to Crude Oil |
| 1989-10-23 | Well Mode changed to Flowing |
| 1989-10-24 | Perforation Treatment Performed - Open-Hole Completion |
| 1991-08-26 | Well Fluid changed to Crude Oil |
| 1991-08-26 | Well Mode changed to Pumping |
| 1995-09-01 | Well Type changed to Observation |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1989-10-17 | 543.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1989-10-24 | Open Hole/Barefoot Completion | 930.00 | 933.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1989 | 1506 | 0.0 | 0.0 | 0.0 |
| 1990 | 8674 | 0.0 | 0.0 | 0.0 |
| 1991 | 8267 | 0.0 | 0.0 | 0.0 |
| 1992 | 8721 | 0.0 | 0.0 | 0.0 |
| 1993 | 8202 | 0.0 | 0.0 | 0.0 |
| 1994 | 6833 | 0.0 | 0.0 | 0.0 |
For data sources see[6]