X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082210000

Well Details

Well ID: 0204082210000
Loading map...
Location: 00/10-22-020-08W4/0
Location Alias: 00/10-22-20-08 W4M
Location Alias 2: 00/10-22-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 22
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 10-22-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0141594
License Date: 1989-10-31
License Status: Suspension
Spud Date: 1989-11-07
Final Drill Date: 1989-11-10
Well Total Depth: 1006.00 m
Surface Hole Latitude: 50.713278
Surface Hole Longitude: -111.026825

For data sources see[1][2]

Well History

Date Event
1989-10-31 Obtained License
1989-11-08 Surface Casing Operation Performed
1989-11-10 Finished Drilling
1989-11-10 Well Log Performed
1989-11-10 Well Mode changed to Drilled and Cased
1989-11-11 Drill Stem Test Performed
1989-11-11 Well Log Performed
1989-11-12 Production Casing Operation Performed
1989-11-12 Rig Released
1989-11-17 Perforation Treatment Performed - Jet Perforation
1989-11-20 Perforation Treatment Performed - Jet Perforation
1989-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-21 Perforation Treatment Performed - Jet Perforation
1989-11-21 Plug Back Performed
1989-11-22 Well Began Production
1989-11-22 Well Fluid changed to Crude Oil
1989-11-22 Well Mode changed to Pumping
2007-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-25 Well Log Performed
2012-10-18 Well Log Performed
2013-11-01 Well Fluid changed to Crude Oil
2013-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-17 Perforation 961.50 963.00 13
1989-11-20 Perforation 968.00 971.00 13
1989-11-21 Packing Device Capped w/Cement 952.00 960.00 0
1989-11-21 Perforation 933.00 934.00 13
1989-11-21 Perforation 934.50 936.00 13
2007-07-25 Acid Treatment 933.00 936.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 936 0.0 0.0 0.0
1990 7907 0.0 0.0 0.0
1991 8589 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8735 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8617 0.0 0.0 0.0
1996 8635 0.0 0.0 0.0
1997 8736 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8719 0.0 0.0 0.0
2002 8753 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 414 0.0 0.0 0.0
2007 1636 0.0 0.0 0.0
2008 3330 0.0 0.0 0.0
2009 6668 0.0 0.0 0.0
2010 7831 0.0 0.0 0.0
2011 8651 0.0 0.0 0.0
2012 6575 0.0 0.0 0.0

For data sources see[5]

References