X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082801002

Well Details

Well ID: 0204082801002
Loading map...
Location: 00/01-28-020-08W4/2
Location Alias: 00/01-28-20-08 W4M
Location Alias 2: 00/01-28-020-08 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 28
County/Municipality: Special Areas No. 2
Well Name: CARDINAL JENNER 1-28-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0158678
License Date: 1993-05-31
License Status: Issued
Spud Date: 1993-06-20
Final Drill Date: 1993-06-27
Well Total Depth: 1006.00 m
Surface Hole Latitude: 50.720948
Surface Hole Longitude: -111.047184

For data sources see[1][2]

Well History

Date Event
1993-05-31 Obtained License
1993-06-21 Surface Casing Operation Performed
1993-06-25 Direction Drilling Operation Performed - Deviate
1993-06-27 Finished Drilling
1993-06-27 Well Mode changed to Drilled and Cased
1993-06-28 Production Casing Operation Performed
1993-06-28 Well Log Performed
1993-06-29 Rig Released
1993-07-24 Perforation Treatment Performed - Jet Perforation
1993-08-17 Well Log Performed
1993-09-01 Well Began Production
1993-09-01 Well Fluid changed to Crude Oil
1993-09-01 Well Mode changed to Pumping
1994-04-11 Perforation Treatment Performed - Cement Squeeze
1994-04-14 Perforation Treatment Performed - Jet Perforation
1994-04-14 Well Log Performed
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1994-07-23 Well Began Injection
1994-07-23 Well Fluid changed to Water
1994-07-23 Well Type changed to Disposal
1995-02-02 Perforation Treatment Performed - Jet Perforation
1995-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-06-25 226.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-24 Perforation 965.00 966.50 13
1993-07-24 Perforation 967.50 968.00 13
1994-04-11 Cement Squeeze 965.00 968.50 0
1994-04-14 Perforation 975.00 982.00 17
1995-02-02 Perforation 972.00 975.00 13
1995-02-03 Acid Treatment 972.00 982.00 0
2009-01-09 Acid Treatment 972.00 982.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2543 0.0 0.0 0.0
1994 370 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

References