If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0204082802032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.719876,"lon":-111.05398,"icon":""}]} |
| Location: 03/02-28-020-08W4/2 | |
| Location Alias: 03/02-28-20-08 W4M | |
| Location Alias 2: 03/02-28-020-08 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 020 | |
| Meridian: 4 | |
| Range: 08 | |
| Section: 28 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: CARDINAL JENNER 2-28-20-8 | |
| Operator Name: Cardinal Energy Ltd. | |
| License Number: 0158676 | |
| License Date: 1993-05-31 | |
| License Status: Suspension | |
| Spud Date: 1993-06-29 | |
| Final Drill Date: 1993-07-02 | |
| Well Total Depth: 988.00 m | |
| Surface Hole Latitude: 50.719876 | |
| Surface Hole Longitude: -111.053980 |
| Date | Event |
|---|---|
| 1993-05-31 | Obtained License |
| 1993-06-30 | Surface Casing Operation Performed |
| 1993-07-02 | Finished Drilling |
| 1993-07-02 | Well Mode changed to Drilled and Cased |
| 1993-07-03 | Production Casing Operation Performed |
| 1993-07-03 | Rig Released |
| 1993-07-03 | Well Log Performed |
| 1993-07-21 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-08-10 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-10 | Plug Back Performed |
| 1994-09-01 | Well Began Production |
| 1994-09-01 | Well Fluid changed to Water |
| 1994-09-01 | Well Type changed to Source |
| 1996-01-01 | Well Fluid changed to Water |
| 1996-01-01 | Well Mode changed to Suspended |
| 1996-01-01 | Well Type changed to Source |
| 1996-03-01 | Well Fluid changed to Water |
| 1996-03-01 | Well Mode changed to Suspended |
| 1996-03-01 | Well Type changed to Source |
| 2001-08-24 | Perforation Treatment Performed - Cement Squeeze |
| 2001-08-24 | Plug Back Performed |
| 2001-08-24 | Well Fluid changed to Water |
| 2001-08-24 | Well Mode changed to Abandoned Zone |
| 2001-08-24 | Well Type changed to Source |
| 2001-08-27 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1993-07-21 | Perforation | 936.50 | 938.50 | 13 |
| 1994-08-10 | Packing Device Capped w/Cement | 922.00 | 930.00 | 0 |
| 1994-08-10 | Perforation | 771.50 | 775.50 | 13 |
| 2001-08-24 | Cement Squeeze | 771.50 | 775.50 | 0 |
| 2001-08-27 | Perforation | 936.50 | 938.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 1968 | 0.0 | 0.0 | 0.0 |
| 1995 | 436 | 0.0 | 0.0 | 0.0 |
| 1996 | 218 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2001-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]