X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204151606000

Well Details

Well ID: 0204151606000
Loading map...
Location: 00/06-16-020-15W4/0
Location Alias: 00/06-16-20-15 W4M
Location Alias 2: 00/06-16-020-15 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 15
Section: 16
County/Municipality: County of Newell
Well Name: JOURNEY COUNTESS 6-16-20-15
Operator Name: Journey Energy Inc.
License Number: 0016117
License Date: 1958-11-12
License Status: Issued
Spud Date: 1958-11-21
Final Drill Date: 1958-11-29
Well Total Depth: 963.20 m
Surface Hole Latitude: 50.694074
Surface Hole Longitude: -112.027094

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-12 Obtained License
1958-11-28 Drill Stem Test Performed
1958-11-29 Finished Drilling
1958-11-30 Perforation Treatment Performed - Bullet Perforation
1958-11-30 Production Casing Operation Performed
1959-01-05 Well Mode changed to Drilled and Cased
1966-02-22 Perforation Treatment Performed - Jet Perforation
1966-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-23 Perforation Treatment Performed - Acid Wash - No Pressure
1966-07-22 Perforation Treatment Performed - Fractured
1966-09-01 Well Began Production
1966-09-01 Well Fluid changed to Gas
1966-09-01 Well Mode changed to Flowing
1995-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-24 Perforation Treatment Performed - Jet Perforation
1995-07-24 Plug Back Performed
1995-07-24 Well Fluid changed to Gas
1995-07-24 Well Log Performed
1995-07-24 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-11-30 Bullet Perforation 936.30 938.80 16
1995-07-24 Packing Device Capped w/Cement 917.00 925.00 0
1995-07-24 Perforation 840.80 842.30 13
1958-11-30 Bullet Perforation 942.40 943.40 16
1958-11-30 Bullet Perforation 944.30 945.20 16
1966-02-22 Perforation 936.30 938.20 7
1966-02-22 Perforation 942.70 943.70 7
1966-02-22 Perforation 944.60 945.20 7
1966-02-23 Acid Wash 936.30 945.20 0
1966-02-23 Acid Treatment 936.30 945.20 0
1966-07-22 Fracture 936.30 945.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 6638 0.0 0.0 0.0
1970 8666 0.0 0.0 0.0
1971 8215 0.0 0.0 0.0
1972 7888 0.0 0.0 0.0
1973 7304 0.0 0.0 0.0
1974 8135 0.0 0.0 0.0
1975 8143 0.0 0.0 0.0
1976 7363 0.0 0.0 0.0
1977 8385 0.0 0.0 0.0
1978 3314 0.0 0.0 0.0
1979 2685 0.0 0.0 0.0
1980 6373 0.0 0.0 0.0
1981 6884 0.0 0.0 0.0
1982 7252 0.0 0.0 0.0
1983 5942 0.0 0.0 0.0
1984 7600 0.0 0.0 0.0
1985 8601 0.0 0.0 0.0
1986 3155 0.0 0.0 0.0
1987 739 0.0 0.0 0.0
1988 543 0.0 0.0 0.0
1989 2289 0.0 0.0 0.0
1992 2552 0.0 0.0 0.0
1993 6508 0.0 0.0 0.0
1994 4335 0.0 0.0 0.0

For data sources see[5]

References