X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204190210002

Well Details

Well ID: 0204190210002
Loading map...
Location: 00/10-02-020-19W4/2
Location Alias: 00/10-02-20-19 W4M
Location Alias 2: 00/10-02-020-19 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 19
Section: 02
County/Municipality: Vulcan County
Well Name: CNRL JUMPBUSH 10-2-20-19
Operator Name: Canadian Natural Resources Limited
License Number: 0045322
License Date: 1973-03-05
License Status: Issued
Spud Date: 1973-03-05
Final Drill Date: 1973-03-10
Well Total Depth: 1303.00 m
Surface Hole Latitude: 50.669551
Surface Hole Longitude: -112.528028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-05 Obtained License
1973-03-10 Drill Stem Test Performed
1973-03-10 Finished Drilling
1973-03-11 Drill Stem Test Performed
1973-03-12 Production Casing Operation Performed
1973-04-17 Perforation Treatment Performed - Jet Perforation
1977-06-30 Perforation Treatment Performed - Jet Perforation
1978-10-10 Well Mode changed to Drilled and Cased
2006-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-29 Plug Back Performed
2006-01-29 Well Log Performed
2006-01-29 Well Mode changed to Abandoned Zone
2006-02-11 Well Log Performed
2006-02-13 Perforation Treatment Performed - Jet Perforation
2006-02-13 Well Log Performed
2006-02-16 Perforation Treatment Performed - Jet Perforation
2006-02-16 Well Log Performed
2006-02-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-04-17 Perforation 1071.40 1071.70 13
2006-01-29 Packing Device Capped w/Cement 1047.00 1055.00 0
2006-01-29 Packing Device Capped w/Cement 1002.00 1010.00 0
2006-02-13 Perforation 465.20 466.70 17
2006-02-16 Perforation 912.80 916.30 17
2006-02-16 Perforation 651.70 656.70 17
2006-02-16 Perforation 534.30 538.80 17
2006-02-16 Perforation 550.00 552.50 17
2006-02-16 Perforation 571.50 573.00 17
2006-02-16 Perforation 587.90 590.40 17
2006-02-27 Fracture 465.20 916.30 0
1977-06-30 Perforation 1021.40 1021.70 7
1977-06-30 Perforation 1026.90 1027.20 7
1977-06-30 Perforation 1028.40 1028.70 7
1977-06-30 Perforation 1029.60 1029.90 7
1977-06-30 Perforation 1033.30 1033.60 7
1977-06-30 Perforation 1035.10 1035.40 7
1977-06-30 Perforation 1059.80 1061.00 7
2006-01-29 Packing Device Capped w/Cement 1056.00 1064.00 0

For data sources see[4]



References