X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204213001002

Well Details

Well ID: 0204213001002
Loading map...
Location: 00/01-30-020-21W4/2
Location Alias: 00/01-30-20-21 W4M
Location Alias 2: 00/01-30-020-21 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 21
Section: 30
County/Municipality: Siksika 146
Well Name: RIDGEBACK SHOLDICE 1-30-20-21
Operator Name: Ridgeback Resources Inc.
License Number: 0165528
License Date: 1994-03-02
License Status: Issued
Spud Date: 1994-03-24
Final Drill Date: 1994-03-29
Well Total Depth: 1475.00 m
Surface Hole Latitude: 50.720136
Surface Hole Longitude: -112.893094

For data sources see[1][2]

Well History

Date Event
1994-03-02 Obtained License
1994-03-25 Surface Casing Operation Performed
1994-03-29 Finished Drilling
1994-03-29 Well Log Performed
1994-03-29 Well Mode changed to Drilled and Cased
1994-03-30 Drill Stem Test Performed
1994-03-31 Production Casing Operation Performed
1994-03-31 Rig Released
1994-04-13 Perforation Treatment Performed - Jet Perforation
1994-04-13 Well Log Performed
2005-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-17 Perforation Treatment Performed - Jet Perforation
2005-01-17 Plug Back Performed
2005-01-21 Perforation Treatment Performed - Fractured
2005-01-23 Perforation Treatment Performed - Jet Perforation
2005-01-24 Perforation Treatment Performed - Fractured
2005-10-19 Perforation Treatment Performed - Chemical Squeeze
2005-11-15 Perforation Treatment Performed - Jet Perforation
2005-11-23 Perforation Treatment Performed - Fractured
2005-12-22 Well Began Production
2005-12-22 Well Fluid changed to Gas
2005-12-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-13 Perforation 1181.00 1182.00 14
2005-10-19 Chemical Squeeze 412.00 416.00 0
2005-10-19 Chemical Squeeze 374.00 376.00 0
2005-10-19 Chemical Squeeze 365.00 369.00 0
2005-11-15 Perforation 795.00 800.00 17
2005-11-15 Perforation 718.00 722.00 17
2005-11-15 Perforation 706.00 710.00 17
2005-11-15 Perforation 693.00 697.00 17
2005-11-15 Perforation 594.00 596.50 17
2005-11-23 Fracture 795.00 800.00 0
2005-11-23 Fracture 718.00 722.00 0
2005-01-17 Packing Device Capped w/Cement 1168.00 1176.00 0
2005-11-23 Fracture 706.00 710.00 0
2005-11-23 Fracture 693.00 697.00 0
2005-11-23 Fracture 594.00 596.50 0
2005-01-17 Perforation 424.00 426.00 20
2005-01-17 Perforation 412.00 416.00 20
2005-01-21 Fracture 412.00 426.00 0
2005-01-23 Perforation 374.00 376.00 20
2005-01-23 Perforation 365.00 369.00 20
2005-01-24 Fracture 365.00 376.00 0
2005-10-19 Chemical Squeeze 424.00 426.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 231 0.0 0.0 0.0
2006 8553 0.0 0.0 0.0
2007 8623 0.0 0.0 0.0
2008 8092 0.0 0.0 0.0
2009 8336 0.0 0.0 0.0
2010 8726 0.0 0.0 0.0
2011 8758 0.0 0.0 0.0
2012 8665 0.0 0.0 0.0
2013 8713 0.0 0.0 0.0
2014 8727 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References