If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205030108052 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.664172,"lon":-114.279872,"icon":""}]} |
Location: 05/08-01-020-03W5/2 | |
Location Alias: 05/08-01-20-03 W5M | |
Location Alias 2: 05/08-01-020-03 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Turner Valley | |
Well Name: OKALTA NO. 22 | |
Operator Name: Katana Resources Ltd. | |
License Number: B0000993 | |
License Date: 1945-06-22 | |
License Status: Abandoned | |
Spud Date: 1945-07-26 | |
Final Drill Date: 1945-10-10 | |
Well Total Depth: 1374.00 m | |
Surface Hole Latitude: 50.664172 | |
Surface Hole Longitude: -114.279872 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1945-06-22 | Obtained License |
1945-10-10 | Finished Drilling |
1945-10-10 | Well Mode changed to Drilled and Cased |
1945-10-11 | Production Casing Operation Performed |
1945-11-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1945-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1945-11-23 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1945-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1945-11-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1945-12-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1945-12-17 | Perforation Treatment Performed - Bullet Perforation |
1945-12-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1946-02-01 | Perforation Treatment Performed - Fractured |
1979-12-20 | Well Began Production |
1979-12-20 | Well Fluid changed to Crude Oil |
1979-12-20 | Well Mode changed to Flowing |
1989-05-01 | Well Fluid changed to Crude Oil |
1989-05-01 | Well Mode changed to Suspended |
1995-06-22 | Well Fluid changed to Crude Oil |
1995-06-22 | Well Mode changed to Closed |
1996-09-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1996-09-28 | Perforation Treatment Performed - Cement Plug |
1996-09-28 | Plug Back Performed |
1996-10-01 | Perforation Treatment Performed - Cement Plug |
1996-10-01 | Plug Back Performed |
1996-10-04 | Well Abandoned |
1996-10-04 | Well Fluid changed to Crude Oil |
1996-10-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1945-11-15 | Hydra Jet Perforation | 1231.40 | 1243.60 | 0 |
1946-02-01 | Fracture | 887.30 | 896.40 | 0 |
1946-02-01 | Fracture | 947.60 | 956.80 | 0 |
1996-09-22 | Hydra Jet Perforation | 1231.40 | 1243.60 | 0 |
1996-09-28 | Cement Plug | 1239.00 | 1289.30 | 0 |
1996-09-28 | Cement Plug | 1124.00 | 1239.00 | 0 |
1996-10-01 | Cement Plug | 970.00 | 1124.00 | 0 |
1996-10-01 | Cement Plug | 850.00 | 970.00 | 0 |
1996-10-01 | Cement Plug | 710.00 | 850.00 | 0 |
1945-11-16 | Acid Treatment | 1231.40 | 1243.60 | 0 |
1945-11-23 | Hydra Jet Perforation | 947.60 | 956.80 | 0 |
1945-11-26 | Acid Treatment | 947.60 | 956.80 | 0 |
1945-11-29 | Acid Treatment | 947.60 | 956.80 | 0 |
1945-12-10 | Hydra Jet Perforation | 887.30 | 896.40 | 0 |
1945-12-17 | Bullet Perforation | 830.30 | 847.30 | 0 |
1945-12-21 | Packing Device Capped w/Cement | 965.60 | 965.60 | 0 |
1946-02-01 | Fracture | 947.60 | 956.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 2682 | 0.0 | 0.0 | 0.0 |
1980 | 3167 | 0.0 | 0.0 | 0.0 |
1981 | 1819 | 0.0 | 0.0 | 0.0 |
1982 | 2102 | 0.0 | 0.0 | 0.0 |
1983 | 2475 | 0.0 | 0.0 | 0.0 |
1984 | 2520 | 0.0 | 0.0 | 0.0 |
1985 | 2520 | 0.0 | 0.0 | 0.0 |
1986 | 2520 | 0.0 | 0.0 | 0.0 |
1987 | 2520 | 0.0 | 0.0 | 0.0 |
1988 | 2590 | 0.0 | 0.0 | 0.0 |
1989 | 540 | 0.0 | 0.0 | 0.0 |
For data sources see[5]