If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205031114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.686738,"lon":-114.315651,"icon":""}]} |
Location: 00/14-11-020-03W5/0 | |
Location Alias: 00/14-11-20-03 W5M | |
Location Alias 2: 00/14-11-020-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Foothills County | |
Well Name: CPEC TV 14-11-20-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0299621 | |
License Date: 2003-12-19 | |
License Status: Abandoned | |
Spud Date: 2003-12-30 | |
Final Drill Date: 2004-01-15 | |
Well Total Depth: 2212.00 m | |
Surface Hole Latitude: 50.686738 | |
Surface Hole Longitude: -114.315651 |
Date | Event |
---|---|
2003-12-19 | Obtained License |
2003-12-31 | Surface Casing Operation Performed |
2004-01-04 | Direction Drilling Operation Performed - Deviate |
2004-01-15 | Finished Drilling |
2004-01-15 | Well Log Performed |
2004-01-15 | Well Mode changed to Drilled and Cased |
2004-01-16 | Well Log Performed |
2004-01-18 | Production Casing Operation Performed |
2004-01-18 | Rig Released |
2004-01-19 | Well Log Performed |
2004-01-26 | Perforation Treatment Performed - Jet Perforation |
2004-01-26 | Well Log Performed |
2004-01-31 | Perforation Treatment Performed - Jet Perforation |
2004-01-31 | Well Log Performed |
2004-02-01 | Well Log Performed |
2004-02-05 | Perforation Treatment Performed - Remedial Casing |
2004-02-07 | Well Log Performed |
2004-02-10 | Perforation Treatment Performed - Jet Perforation |
2004-02-10 | Well Log Performed |
2004-02-11 | Perforation Treatment Performed - Jet Perforation |
2004-02-11 | Perforation Treatment Performed - Remedial Casing |
2004-02-11 | Well Log Performed |
2004-02-12 | Perforation Treatment Performed - Remedial Casing |
2004-02-14 | Perforation Treatment Performed - Jet Perforation |
2004-02-14 | Well Log Performed |
2004-02-15 | Perforation Treatment Performed - Remedial Casing |
2004-02-17 | Perforation Treatment Performed - Jet Perforation |
2004-02-17 | Perforation Treatment Performed - Remedial Casing |
2004-02-17 | Well Log Performed |
2004-02-23 | Well Log Performed |
2004-02-24 | Perforation Treatment Performed - Jet Perforation |
2004-02-24 | Well Log Performed |
2004-02-25 | Perforation Treatment Performed - Fractured |
2004-02-26 | Perforation Treatment Performed - Jet Perforation |
2004-02-26 | Well Log Performed |
2004-02-27 | Perforation Treatment Performed - Fractured |
2004-02-29 | Perforation Treatment Performed - Jet Perforation |
2004-02-29 | Well Log Performed |
2004-03-01 | Perforation Treatment Performed - Fractured |
2004-03-05 | Perforation Treatment Performed - Cement Squeeze |
2004-03-05 | Perforation Treatment Performed - Jet Perforation |
2004-03-05 | Well Log Performed |
2004-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-03-06 | Perforation Treatment Performed - Jet Perforation |
2004-03-06 | Well Log Performed |
2004-03-11 | Well Log Performed |
2004-03-12 | Well Log Performed |
2004-03-14 | Perforation Treatment Performed - Fractured |
2004-03-17 | Perforation Treatment Performed - Fractured |
2010-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-23 | Plug Back Performed |
2010-09-23 | Well Mode changed to Abandoned Zone |
2010-10-06 | Well Abandoned |
2010-10-06 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-01-04 | 1080.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-01-26 | Perforation | 2180.00 | 2180.30 | 24 |
2004-02-14 | Perforation | 1750.00 | 1750.50 | 13 |
2004-02-14 | Perforation | 1700.00 | 1700.50 | 13 |
2004-02-15 | Remedial Casing Cementing | 1700.00 | 1750.50 | 0 |
2004-02-17 | Perforation | 1300.00 | 1300.50 | 13 |
2004-02-17 | Remedial Casing Cementing | 1300.00 | 1300.50 | 0 |
2004-02-24 | Perforation | 2152.00 | 2155.00 | 13 |
2004-02-25 | Fracture | 2152.00 | 2155.00 | 0 |
2004-02-26 | Perforation | 2152.00 | 2155.00 | 20 |
2004-02-27 | Fracture | 2152.00 | 2155.00 | 0 |
2004-02-29 | Perforation | 2068.00 | 2072.00 | 20 |
2004-01-26 | Perforation | 2030.00 | 2030.50 | 20 |
2004-03-01 | Fracture | 2068.00 | 2072.00 | 0 |
2004-03-05 | Cement Squeeze | 2068.00 | 2072.00 | 0 |
2004-03-05 | Perforation | 1891.00 | 1895.00 | 20 |
2004-03-06 | Packing Device Capped w/Cement | 1879.00 | 1887.00 | 0 |
2004-03-06 | Perforation | 1144.00 | 1148.00 | 20 |
2004-03-06 | Perforation | 1095.00 | 1099.00 | 20 |
2004-03-14 | Fracture | 1144.00 | 1148.00 | 0 |
2004-03-17 | Fracture | 1095.00 | 1099.00 | 0 |
2010-09-23 | Packing Device Capped w/Cement | 1157.50 | 1165.50 | 0 |
2010-09-23 | Packing Device Capped w/Cement | 1082.00 | 1090.00 | 0 |
2004-01-31 | Perforation | 2160.00 | 2160.30 | 24 |
2004-02-05 | Remedial Casing Cementing | 2180.00 | 2180.30 | 0 |
2004-02-10 | Perforation | 2159.50 | 2160.10 | 14 |
2004-02-11 | Remedial Casing Cementing | 2159.50 | 2160.30 | 0 |
2004-02-11 | Perforation | 2091.50 | 2092.00 | 13 |
2004-02-12 | Remedial Casing Cementing | 2091.50 | 2092.00 | 0 |
2004-02-12 | Remedial Casing Cementing | 2030.00 | 2030.50 | 0 |
For data sources see[5]