If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205043311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.741592,"lon":-114.499858,"icon":""}]} |
Location: 00/11-33-020-04W5/0 | |
Location Alias: 00/11-33-20-04 W5M | |
Location Alias 2: 00/11-33-020-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 04 | |
Section: 33 | |
County/Municipality: Foothills County | |
Well Name: CALEDONIANMID QUIRK CK 11-33-20-4 | |
Operator Name: Caledonian Midstream Corporation | |
License Number: 0033005 | |
License Date: 1967-11-02 | |
License Status: Issued | |
Spud Date: 1967-11-08 | |
Final Drill Date: 1968-01-10 | |
Well Total Depth: 1911.10 m | |
Surface Hole Latitude: 50.741592 | |
Surface Hole Longitude: -114.499858 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-11-02 | Obtained License |
1967-12-18 | Drill Stem Test Performed |
1968-01-09 | Drill Stem Test Performed |
1968-01-10 | Finished Drilling |
1968-01-10 | Well Mode changed to Drilled and Cased |
1968-01-12 | Liner Casing Operation Performed |
1968-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-04-03 | Perforation Treatment Performed - Selective Jet Perforations |
1968-04-15 | Perforation Treatment Performed - Selective Bullet Perforations |
1968-04-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-05-03 | Perforation Treatment Performed - Selective Jet Perforations |
1968-05-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-02-06 | Well Began Production |
1971-02-06 | Well Fluid changed to Gas |
1971-02-06 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1968-04-03 | Selective Jet Perforations | 1759.00 | 1761.70 | 0 |
1968-04-15 | Selective Bullet Perforations | 1731.00 | 1731.30 | 0 |
1968-04-15 | Selective Bullet Perforations | 1731.60 | 1733.10 | 0 |
1968-04-15 | Selective Bullet Perforations | 1733.40 | 1734.00 | 0 |
1968-04-15 | Selective Bullet Perforations | 1734.60 | 1737.40 | 0 |
1968-04-15 | Selective Bullet Perforations | 1737.70 | 1738.00 | 0 |
1968-04-15 | Selective Bullet Perforations | 1746.20 | 1746.50 | 0 |
1968-04-15 | Selective Bullet Perforations | 1746.80 | 1748.00 | 0 |
1968-04-15 | Selective Bullet Perforations | 1748.30 | 1749.20 | 0 |
1968-04-16 | Acid Treatment | 1731.00 | 1749.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1835.50 | 1840.40 | 0 |
1968-04-03 | Selective Jet Perforations | 1762.40 | 1780.30 | 0 |
1968-05-03 | Selective Jet Perforations | 1841.60 | 1842.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1843.70 | 1847.40 | 0 |
1968-05-03 | Selective Jet Perforations | 1849.50 | 1858.70 | 0 |
1968-05-03 | Selective Jet Perforations | 1859.60 | 1860.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1870.60 | 1870.90 | 0 |
1968-05-03 | Selective Jet Perforations | 1871.20 | 1873.90 | 0 |
1968-05-03 | Selective Jet Perforations | 1875.10 | 1876.00 | 0 |
1968-05-03 | Selective Jet Perforations | 1877.90 | 1878.80 | 0 |
1968-05-03 | Selective Jet Perforations | 1882.10 | 1882.40 | 0 |
1968-05-03 | Selective Jet Perforations | 1882.70 | 1884.00 | 0 |
1968-04-03 | Selective Jet Perforations | 1780.90 | 1786.40 | 0 |
1968-05-03 | Selective Jet Perforations | 1884.90 | 1888.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1889.20 | 1891.00 | 0 |
1968-05-03 | Selective Jet Perforations | 1891.30 | 1891.60 | 0 |
1968-05-03 | Selective Jet Perforations | 1891.90 | 1892.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1892.50 | 1892.80 | 0 |
1968-05-03 | Selective Jet Perforations | 1894.00 | 1895.60 | 0 |
1968-05-03 | Selective Jet Perforations | 1895.90 | 1896.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1896.50 | 1896.80 | 0 |
1968-05-03 | Selective Jet Perforations | 1897.10 | 1897.40 | 0 |
1968-05-03 | Selective Jet Perforations | 1897.70 | 1898.00 | 0 |
1968-04-03 | Selective Jet Perforations | 1787.70 | 1788.90 | 0 |
1968-05-03 | Selective Jet Perforations | 1898.30 | 1898.60 | 0 |
1968-05-03 | Selective Jet Perforations | 1898.90 | 1899.20 | 0 |
1968-05-03 | Selective Jet Perforations | 1899.50 | 1899.80 | 0 |
1968-05-03 | Selective Jet Perforations | 1900.10 | 1900.40 | 0 |
1968-05-03 | Selective Jet Perforations | 1900.70 | 1901.00 | 0 |
1968-05-03 | Selective Jet Perforations | 1901.00 | 1902.90 | 0 |
1968-05-03 | Selective Jet Perforations | 1903.20 | 1903.50 | 0 |
1968-05-03 | Selective Jet Perforations | 1903.80 | 1904.10 | 0 |
1968-05-03 | Selective Jet Perforations | 1905.30 | 1906.50 | 0 |
1968-05-04 | Acid Treatment | 1835.50 | 1906.50 | 0 |
1968-04-03 | Selective Jet Perforations | 1789.50 | 1790.10 | 0 |
1969-03-09 | Acid Treatment | 1835.50 | 1906.50 | 0 |
1969-03-15 | Acid Treatment | 1835.50 | 1906.50 | 0 |
1968-04-03 | Selective Jet Perforations | 1790.70 | 1791.30 | 0 |
1968-04-03 | Selective Jet Perforations | 1791.90 | 1795.90 | 0 |
1968-04-03 | Selective Jet Perforations | 1796.80 | 1799.20 | 0 |
1968-04-03 | Acid Treatment | 1759.00 | 1799.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 6910 | 0.0 | 0.0 | 0.0 |
1972 | 7451 | 0.0 | 0.0 | 0.0 |
1973 | 8269 | 0.0 | 0.0 | 0.0 |
1974 | 8212 | 0.0 | 0.0 | 0.0 |
1975 | 8396 | 0.0 | 0.0 | 0.0 |
1976 | 7687 | 0.0 | 0.0 | 0.0 |
1977 | 7005 | 0.0 | 0.0 | 0.0 |
1978 | 7063 | 0.0 | 0.0 | 0.0 |
1979 | 8190 | 0.0 | 0.0 | 0.0 |
1980 | 6291 | 0.0 | 0.0 | 0.0 |
1981 | 6511 | 0.0 | 0.0 | 0.0 |
1982 | 5965 | 0.0 | 0.0 | 0.0 |
1983 | 3133 | 0.0 | 0.0 | 0.0 |
1984 | 5123 | 0.0 | 0.0 | 0.0 |
1985 | 4323 | 0.0 | 0.0 | 0.0 |
1986 | 7684 | 0.0 | 0.0 | 0.0 |
1987 | 6745 | 0.0 | 0.0 | 0.0 |
1988 | 8216 | 0.0 | 0.0 | 0.0 |
1989 | 8113 | 0.0 | 0.0 | 0.0 |
1990 | 8525 | 0.0 | 0.0 | 0.0 |
1991 | 8139 | 0.0 | 0.0 | 0.0 |
1992 | 8212 | 0.0 | 0.0 | 0.0 |
1993 | 8440 | 0.0 | 0.0 | 0.0 |
1994 | 7857 | 0.0 | 0.0 | 0.0 |
1995 | 8631 | 0.0 | 0.0 | 0.0 |
1996 | 6103 | 0.0 | 0.0 | 0.0 |
1997 | 8742 | 0.0 | 0.0 | 0.0 |
1998 | 7848 | 0.0 | 0.0 | 0.0 |
1999 | 8456 | 0.0 | 0.0 | 0.0 |
2000 | 8492 | 0.0 | 0.0 | 0.0 |
2001 | 7709 | 0.0 | 0.0 | 0.0 |
2002 | 8614 | 0.0 | 0.0 | 0.0 |
2003 | 8629 | 0.0 | 0.0 | 0.0 |
2004 | 7776 | 0.0 | 0.0 | 0.0 |
2005 | 7675 | 0.0 | 0.0 | 0.0 |
2006 | 8349 | 0.0 | 0.0 | 0.0 |
2007 | 5001 | 0.0 | 0.0 | 0.0 |
2008 | 4615 | 0.0 | 0.0 | 0.0 |
2009 | 7625 | 0.0 | 0.0 | 0.0 |
2010 | 7622 | 0.0 | 0.0 | 0.0 |
2011 | 7596 | 0.0 | 0.0 | 0.0 |
2012 | 8678 | 0.0 | 0.0 | 0.0 |
2013 | 8015 | 0.0 | 0.0 | 0.0 |
2014 | 2160 | 0.0 | 0.0 | 0.0 |
2015 | 7457 | 0.0 | 0.0 | 0.0 |
2016 | 8711 | 0.0 | 0.0 | 0.0 |
2017 | 6258 | 0.0 | 0.0 | 0.0 |
2018 | 8503 | 0.0 | 0.0 | 0.0 |
2019 | 8572 | 0.0 | 0.0 | 0.0 |
2020 | 1927 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1972-07-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]