Well ID: 0214030906000
Loading map...
Location: 00/06-09-021-03W4/0
Location Alias: 00/06-09-21-03 W4M
Location Alias 2: 00/06-09-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 09
County/Municipality: Special Areas No. 2
Well Name: CLARION ET AL ATLEE 6-9-21-3
Operator Name: Devon Canada Corporation
License Number: 0084500
License Date: 1980-07-28
License Status: RecCertified
Spud Date: 1980-08-16
Final Drill Date: 1980-08-17
Well Total Depth: 503.00 m
Surface Hole Latitude: 50.766062
Surface Hole Longitude: -110.368044

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-28 Obtained License
1980-08-17 Finished Drilling
1980-08-17 Production Casing Operation Performed
1980-08-17 Well Mode changed to Drilled and Cased
1980-09-02 Perforation Treatment Performed - Jet Perforation
1980-09-04 Perforation Treatment Performed - Fractured
1980-09-08 Perforation Treatment Performed - Selective Bullet Perforations
1980-09-10 Perforation Treatment Performed - Fractured
1980-10-01 Well Began Production
1980-10-01 Well Fluid changed to Gas
1980-10-01 Well Mode changed to Flowing
1990-06-19 Well Log Performed
1990-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-20 Plug Back Performed
1990-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-21 Plug Back Performed
1990-06-21 Well Fluid changed to Gas
1990-06-21 Well Mode changed to Abandoned
1990-06-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-02 Perforation 465.70 467.70 7
1980-09-08 Selective Bullet Perforations 389.40 389.60 0
1980-09-08 Selective Bullet Perforations 391.00 400.90 0
1980-09-08 Selective Bullet Perforations 401.50 402.30 0
1980-09-08 Selective Bullet Perforations 402.80 402.80 0
1980-09-10 Fracture 375.00 402.80 0
1990-06-20 Packing Device Capped w/Cement 440.00 448.00 0
1990-06-21 Packing Device Capped w/Cement 364.00 372.00 0
1990-06-21 Packing Device Capped w/Cement 157.00 165.00 0
1980-09-04 Fracture 465.70 467.70 0
1980-09-08 Selective Bullet Perforations 375.00 375.60 0
1980-09-08 Selective Bullet Perforations 376.20 376.80 0
1980-09-08 Selective Bullet Perforations 377.40 380.00 0
1980-09-08 Selective Bullet Perforations 380.60 381.20 0
1980-09-08 Selective Bullet Perforations 383.00 383.60 0
1980-09-08 Selective Bullet Perforations 384.20 384.80 0
1980-09-08 Selective Bullet Perforations 385.40 386.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2191 0.0 0.0 0.0
1981 8709 0.0 0.0 0.0
1982 8199 0.0 0.0 0.0
1983 8726 0.0 0.0 0.0
1984 8740 0.0 0.0 0.0
1985 8016 0.0 0.0 0.0
1986 8732 0.0 0.0 0.0
1987 7971 0.0 0.0 0.0
1988 7270 0.0 0.0 0.0
1989 5820 0.0 0.0 0.0
1990 3963 0.0 0.0 0.0

For data sources see[5]

References