X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214060116020

Well Details

Well ID: 0214060116020
Loading map...
Location: 02/16-01-021-06W4/0
Location Alias: 02/16-01-21-06 W4M
Location Alias 2: 02/16-01-021-06 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 01
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK ATL-BUFF 16-1-21-6
Operator Name: Ridgeback Resources Inc.
License Number: 0274661
License Date: 2002-10-11
License Status: Suspension
Spud Date: 2002-10-27
Final Drill Date: 2002-10-27
Well Total Depth: 556.80 m
Surface Hole Latitude: 50.760843
Surface Hole Longitude: -110.698537

For data sources see[1][2]

Well History

Date Event
2002-10-11 Obtained License
2002-10-17 Conductor Casing Operation Performed
2002-10-27 Finished Drilling
2002-10-28 Production Casing Operation Performed
2002-10-28 Rig Released
2002-10-28 Well Mode changed to Drilled and Cased
2002-11-02 Well Log Performed
2002-11-12 Perforation Treatment Performed - Jet Perforation
2002-11-14 Perforation Treatment Performed - Fractured
2002-11-28 Perforation Treatment Performed - Jet Perforation
2002-11-29 Perforation Treatment Performed - Fractured
2003-05-20 Well Began Production
2003-05-20 Well Fluid changed to Gas
2003-05-20 Well Mode changed to Flowing
2011-11-20 Well Fluid changed to Gas
2011-11-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-12 Perforation 483.00 487.50 13
2002-11-29 Fracture 404.00 407.00 0
2002-11-14 Fracture 483.00 487.50 0
2002-11-28 Perforation 430.50 432.50 7
2002-11-28 Perforation 420.00 424.00 7
2002-11-28 Perforation 410.00 412.00 7
2002-11-28 Perforation 404.00 407.00 7
2002-11-29 Fracture 430.50 432.50 0
2002-11-29 Fracture 420.00 424.00 0
2002-11-29 Fracture 410.00 412.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 336 0.0 0.0 0.0
2004 2376 0.0 0.0 0.0
2005 5105 0.0 0.0 0.0
2006 3017 0.0 0.0 0.0
2007 1704 0.0 0.0 0.0
2008 1704 0.0 0.0 0.0
2009 5904 0.0 0.0 0.0
2010 552 0.0 0.0 0.0

For data sources see[5]

References