X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214082312000

Well Details

Well ID: 0214082312000
Loading map...
Location: 00/12-23-021-08W4/0
Location Alias: 00/12-23-21-08 W4M
Location Alias 2: 00/12-23-021-08 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 08
Section: 23
County/Municipality: Special Areas No. 2
Well Name: COLGAS ET AL JENNER 12-23-21-8
Operator Name: Devon Aog Corporation
License Number: 0125225
License Date: 1986-12-18
License Status: RecCertified
Spud Date: 1986-12-20
Final Drill Date: 1987-01-02
Well Total Depth: 1032.50 m
Surface Hole Latitude: 50.800819
Surface Hole Longitude: -111.018366

For data sources see[1][2]

Well History

Date Event
1986-01-03 Well Log Performed
1986-12-18 Obtained License
1986-12-22 Surface Casing Operation Performed
1987-01-02 Finished Drilling
1987-01-03 Well Log Performed
1987-01-04 Drill Stem Test Performed
1987-01-06 Production Casing Operation Performed
1987-01-06 Rig Released
1987-01-06 Well Mode changed to Drilled and Cased
1987-02-08 Well Log Performed
1987-02-09 Perforation Treatment Performed - Jet Perforation
1987-02-09 Well Log Performed
1987-02-11 Perforation Treatment Performed - Jet Perforation
1987-02-11 Well Log Performed
1987-02-12 Perforation Treatment Performed - Cement Squeeze
1987-02-12 Well Log Performed
1987-02-16 Perforation Treatment Performed - Jet Perforation
1987-02-16 Well Log Performed
1987-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-23 Perforation Treatment Performed - Cement Squeeze
1987-02-27 Perforation Treatment Performed - Jet Perforation
1987-02-27 Well Log Performed
1987-03-03 Perforation Treatment Performed - Bridge Plug No Cement Required
1987-03-03 Perforation Treatment Performed - Jet Perforation
1987-03-03 Well Log Performed
1987-03-04 Well Log Performed
1988-12-12 Well Began Production
1988-12-12 Well Fluid changed to Gas
1988-12-12 Well Mode changed to Flowing
1990-10-25 Well Fluid changed to Gas
1990-10-25 Well Mode changed to Suspended
1992-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-07 Plug Back Performed
1992-05-07 Well Fluid changed to Gas
1992-05-07 Well Mode changed to Abandoned
1992-05-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-02-09 Perforation 981.00 982.50 13
1992-05-07 Packing Device Capped w/Cement 962.00 970.00 0
1987-02-11 Perforation 986.50 987.50 13
1987-02-12 Cement Squeeze 981.00 982.50 0
1987-02-16 Perforation 981.00 982.00 13
1987-02-19 Acid Treatment 981.00 987.50 0
1987-02-23 Cement Squeeze 981.00 987.50 0
1987-02-27 Perforation 986.50 987.50 13
1987-03-03 Bridge Plug, No Cement 979.70 979.70 0
1987-03-03 Perforation 977.40 978.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 410 0.0 0.0 0.0
1989 6522 0.0 0.0 0.0
1990 4482 0.0 0.0 0.0

For data sources see[5]

References