0214083306000

Well Details

Well ID: 0214083306000
Loading map...
Location: 00/06-33-021-08W4/0
Location Alias: 00/06-33-21-08 W4M
Location Alias 2: 00/06-33-021-08 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 08
Section: 33
County/Municipality: Special Areas No. 2
Well Name: RIMOIL JENNER 6-33-21-8
Operator Name: Lightstream Resources Ltd.
License Number: 0055661
License Date: 1975-11-03
License Status: RecCertified
Spud Date: 1975-11-15
Final Drill Date: 1975-11-16
Well Total Depth: 466.30 m
Surface Hole Latitude: 50.826607
Surface Hole Longitude: -111.055512

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-03 Obtained License
1975-11-16 Finished Drilling
1975-11-16 Production Casing Operation Performed
1975-11-16 Well Mode changed to Drilled and Cased
1975-11-28 Perforation Treatment Performed - Bullet Perforation
1975-11-28 Perforation Treatment Performed - Fractured
1975-11-28 Perforation Treatment Performed - Selective Bullet Perforations
1976-08-12 Well Began Production
1976-08-12 Well Fluid changed to Gas
1976-08-12 Well Mode changed to Flowing
1988-09-01 Well Fluid changed to Gas
1988-09-01 Well Mode changed to Suspended
1992-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-26 Plug Back Performed
1992-05-26 Well Fluid changed to Gas
1992-05-26 Well Mode changed to Abandoned
1992-07-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-28 Selective Bullet Perforations 399.30 403.60 0
1975-11-28 Bullet Perforation 438.00 438.00 7
1975-11-28 Selective Bullet Perforations 438.30 439.50 0
1975-11-28 Fracture 399.30 439.50 0
1992-05-26 Packing Device Capped w/Cement 387.00 395.00 0
1975-11-28 Selective Bullet Perforations 419.70 420.30 0
1975-11-28 Selective Bullet Perforations 431.30 434.60 0
1975-11-28 Bullet Perforation 434.90 434.90 7
1975-11-28 Bullet Perforation 435.30 435.90 3
1975-11-28 Bullet Perforation 436.20 436.20 7
1975-11-28 Bullet Perforation 436.50 436.80 3
1975-11-28 Bullet Perforation 437.10 437.10 7
1975-11-28 Bullet Perforation 437.40 437.70 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3103 0.0 0.0 0.0
1977 6574 0.0 0.0 0.0
1978 5835 0.0 0.0 0.0
1979 6211 0.0 0.0 0.0
1980 5176 0.0 0.0 0.0
1981 6375 0.0 0.0 0.0
1982 3284 0.0 0.0 0.0
1983 6973 0.0 0.0 0.0
1984 7318 0.0 0.0 0.0
1985 8757 0.0 0.0 0.0
1986 6599 0.0 0.0 0.0
1987 7730 0.0 0.0 0.0

For data sources see[5]

References