X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214090214000

Well Details

Well ID: 0214090214000
Loading map...
Location: 00/14-02-021-09W4/0
Location Alias: 00/14-02-21-09 W4M
Location Alias 2: 00/14-02-021-09 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 09
Section: 02
County/Municipality: Special Areas No. 2
Well Name: MAGNUMENERGY JENNER 14-2-21-9
Operator Name: Aeraden Energy Corp.
License Number: 0067333
License Date: 1977-12-08
License Status: Abandoned
Spud Date: 1978-07-13
Final Drill Date: 1978-07-20
Well Total Depth: 675.00 m
Surface Hole Latitude: 50.761037
Surface Hole Longitude: -111.147706

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-08 Obtained License
1978-07-13 Lost Circulation Occurred
1978-07-20 Finished Drilling
1978-07-20 Well Mode changed to Drilled and Cased
1978-07-21 Production Casing Operation Performed
1978-07-26 Perforation Treatment Performed - Bullet Perforation
1978-07-27 Perforation Treatment Performed - Fractured
1978-09-28 Perforation Treatment Performed - Bullet Perforation
1978-09-29 Perforation Treatment Performed - Fractured
1978-10-02 Well Began Production
1978-10-02 Well Fluid changed to Gas
1978-10-02 Well Mode changed to Flowing
2005-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-23 Plug Back Performed
2005-11-23 Well Fluid changed to Gas
2005-11-23 Well Mode changed to Abandoned Zone
2006-01-10 Well Abandoned
2006-01-10 Well Fluid changed to Gas
2006-01-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-26 Bullet Perforation 552.00 555.00 7
1978-09-28 Bullet Perforation 393.00 394.00 3
1978-09-28 Bullet Perforation 401.00 402.00 3
1978-09-28 Bullet Perforation 413.00 419.50 3
1978-09-29 Fracture 379.50 419.50 0
2005-11-23 Packing Device Capped w/Cement 535.00 543.00 0
2005-11-23 Packing Device Capped w/Cement 362.00 370.00 0
1978-07-26 Bullet Perforation 573.50 574.50 7
1978-07-26 Bullet Perforation 581.00 583.00 7
1978-07-26 Bullet Perforation 605.00 606.50 7
1978-07-26 Bullet Perforation 612.50 613.00 13
1978-07-26 Bullet Perforation 624.00 624.50 13
1978-07-27 Fracture 552.00 624.50 0
1978-09-28 Bullet Perforation 379.50 380.50 3
1978-09-28 Bullet Perforation 385.50 387.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2208 0.0 0.0 0.0
1979 6325 0.0 0.0 0.0
1980 5127 0.0 0.0 0.0
1981 6373 0.0 0.0 0.0
1982 8637 0.0 0.0 0.0
1983 8742 0.0 0.0 0.0
1984 8763 0.0 0.0 0.0
1985 8736 0.0 0.0 0.0
1986 8741 0.0 0.0 0.0
1987 8754 0.0 0.0 0.0
1988 8687 0.0 0.0 0.0
1989 8420 0.0 0.0 0.0
1990 7717 0.0 0.0 0.0
1991 8757 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8687 0.0 0.0 0.0
1994 8486 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8755 0.0 0.0 0.0
1997 8015 0.0 0.0 0.0
2001 6863 0.0 0.0 0.0
2004 1320 0.0 0.0 0.0
2005 8015 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-13 Lost Circulation 20.00 183.00

For data sources see[6]

References