If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0214091514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.789838,"lon":-111.171007,"icon":""}]} |
Location: 00/14-15-021-09W4/0 | |
Location Alias: 00/14-15-21-09 W4M | |
Location Alias 2: 00/14-15-021-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 4 | |
Range: 09 | |
Section: 15 | |
County/Municipality: Special Areas No. 2 | |
Well Name: RIMOIL ET AL JENNER 14-15-21-9 | |
Operator Name: Lightstream Resources Ltd. | |
License Number: 0106836 | |
License Date: 1984-04-25 | |
License Status: RecCertified | |
Spud Date: 1984-05-06 | |
Final Drill Date: 1984-05-07 | |
Well Total Depth: 514.00 m | |
Surface Hole Latitude: 50.789838 | |
Surface Hole Longitude: -111.171007 |
Date | Event |
---|---|
1984-04-25 | Obtained License |
1984-05-07 | Finished Drilling |
1984-05-07 | Production Casing Operation Performed |
1984-05-07 | Well Mode changed to Drilled and Cased |
1984-05-15 | Well Log Performed |
1984-05-21 | Perforation Treatment Performed - Jet Perforation |
1984-05-21 | Perforation Treatment Performed - Selective Jet Perforations |
1984-05-22 | Perforation Treatment Performed - Fractured |
1984-05-22 | Perforation Treatment Performed - Jet Perforation |
1984-05-22 | Perforation Treatment Performed - Selective Jet Perforations |
1984-05-23 | Perforation Treatment Performed - Fractured |
1984-06-19 | Well Began Production |
1984-06-19 | Well Fluid changed to Gas |
1984-06-19 | Well Mode changed to Flowing |
1992-05-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-05-18 | Plug Back Performed |
1992-05-18 | Well Abandoned |
1992-05-18 | Well Fluid changed to Gas |
1992-05-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-05-21 | Selective Jet Perforations | 474.30 | 474.30 | 0 |
1984-05-22 | Selective Jet Perforations | 377.00 | 377.00 | 0 |
1984-05-22 | Selective Jet Perforations | 368.50 | 368.50 | 0 |
1984-05-22 | Selective Jet Perforations | 344.00 | 344.00 | 0 |
1984-05-23 | Fracture | 344.00 | 406.00 | 0 |
1992-05-18 | Packing Device Capped w/Cement | 252.00 | 260.00 | 0 |
1984-05-21 | Perforation | 478.30 | 480.30 | 7 |
1984-05-21 | Selective Jet Perforations | 484.00 | 484.00 | 0 |
1984-05-21 | Selective Jet Perforations | 488.50 | 488.50 | 0 |
1984-05-22 | Fracture | 474.30 | 488.50 | 0 |
1984-05-22 | Perforation | 404.00 | 406.00 | 7 |
1984-05-22 | Selective Jet Perforations | 396.80 | 396.80 | 0 |
1984-05-22 | Selective Jet Perforations | 393.50 | 393.50 | 0 |
1984-05-22 | Selective Jet Perforations | 385.00 | 385.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 4692 | 0.0 | 0.0 | 0.0 |
1985 | 8661 | 0.0 | 0.0 | 0.0 |
1986 | 8732 | 0.0 | 0.0 | 0.0 |
1987 | 8758 | 0.0 | 0.0 | 0.0 |
1988 | 7951 | 0.0 | 0.0 | 0.0 |
1989 | 8694 | 0.0 | 0.0 | 0.0 |
1990 | 8520 | 0.0 | 0.0 | 0.0 |
1991 | 5085 | 0.0 | 0.0 | 0.0 |
For data sources see[5]