X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214093606000

Well Details

Well ID: 0214093606000
Loading map...
Location: 00/06-36-021-09W4/0
Location Alias: 00/06-36-21-09 W4M
Location Alias 2: 00/06-36-021-09 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 09
Section: 36
County/Municipality: Special Areas No. 2
Well Name: PETROY ET AL JENNER 6-36-21-9
Operator Name: Lightstream Resources Ltd.
License Number: 0056408
License Date: 1975-12-31
License Status: RecCertified
Spud Date: 1976-01-05
Final Drill Date: 1976-01-07
Well Total Depth: 495.30 m
Surface Hole Latitude: 50.825965
Surface Hole Longitude: -111.125029

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-31 Obtained License
1976-01-07 Finished Drilling
1976-01-07 Production Casing Operation Performed
1976-01-11 Perforation Treatment Performed - Selective Bullet Perforations
1976-01-12 Perforation Treatment Performed - Fractured
1976-01-20 Well Mode changed to Drilled and Cased
1977-01-01 Well Began Production
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Flowing
1990-03-02 Well Log Performed
1990-04-17 Perforation Treatment Performed - Jet Perforation
1990-05-27 Perforation Treatment Performed - Cement Squeeze
1990-05-27 Plug Back Performed
1992-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-27 Plug Back Performed
1992-04-27 Well Abandoned
1992-04-27 Well Fluid changed to Gas
1992-04-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-11 Selective Bullet Perforations 345.00 345.90 0
1976-01-11 Selective Bullet Perforations 407.20 407.80 0
1976-01-11 Selective Bullet Perforations 409.00 410.30 0
1976-01-11 Selective Bullet Perforations 412.70 413.30 0
1976-01-11 Selective Bullet Perforations 418.20 420.00 0
1976-01-12 Fracture 345.00 420.00 0
1990-04-17 Perforation 207.00 210.50 13
1990-05-27 Cement Squeeze 207.00 210.50 0
1992-04-27 Packing Device Capped w/Cement 332.00 340.00 0
1976-01-11 Selective Bullet Perforations 351.70 361.20 0
1976-01-11 Selective Bullet Perforations 361.80 362.40 0
1976-01-11 Selective Bullet Perforations 365.50 377.30 0
1976-01-11 Selective Bullet Perforations 378.00 382.50 0
1976-01-11 Selective Bullet Perforations 385.60 396.80 0
1976-01-11 Selective Bullet Perforations 397.50 404.80 0
1976-01-11 Selective Bullet Perforations 405.10 405.40 0
1976-01-11 Selective Bullet Perforations 406.00 406.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6532 0.0 0.0 0.0
1978 6091 0.0 0.0 0.0
1979 6215 0.0 0.0 0.0
1980 5123 0.0 0.0 0.0
1981 6346 0.0 0.0 0.0
1982 8728 0.0 0.0 0.0
1983 8572 0.0 0.0 0.0
1984 8716 0.0 0.0 0.0
1985 8603 0.0 0.0 0.0
1986 8706 0.0 0.0 0.0
1987 8752 0.0 0.0 0.0
1988 8015 0.0 0.0 0.0
1989 8076 0.0 0.0 0.0
1990 5821 0.0 0.0 0.0
1991 8757 0.0 0.0 0.0
1992 2903 0.0 0.0 0.0

For data sources see[5]

References