X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0215031809000

Well Details

Well ID: 0215031809000
Loading map...
Location: 00/09-18-021-03W5/0
Location Alias: 00/09-18-21-03 W5M
Location Alias 2: 00/09-18-021-03 W5/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 5
Range: 03
Section: 18
County/Municipality: Foothills County
Well Name: CNRL NO 16 TV 9-18-21-3
Operator Name: Canadian Natural Resources Limited
License Number: B0000484
License Date: 1943-09-10
License Status: Issued
Spud Date: 1943-09-11
Final Drill Date: 1944-05-28
Well Total Depth: 2665.80 m
Surface Hole Latitude: 50.784857
Surface Hole Longitude: -114.397149

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1943-09-10 Obtained License
1944-05-16 Production Casing Operation Performed
1944-05-28 Finished Drilling
1944-05-28 Perforation Treatment Performed - Open-Hole Completion
1944-05-28 Well Mode changed to Drilled and Cased
1944-05-29 Well Began Production
1944-05-29 Well Fluid changed to Crude Oil
1944-05-29 Well Mode changed to Flowing
1944-06-04 Perforation Treatment Performed - Acid Wash - No Pressure
1944-06-08 Perforation Treatment Performed - Acid Wash - No Pressure
1944-06-11 Perforation Treatment Performed - Acid Wash - No Pressure
1944-07-09 Perforation Treatment Performed - Acid Wash - No Pressure
1964-05-31 Perforation Treatment Performed - Bullet Perforation
1964-06-05 Well Fluid changed to Crude Oil
1964-06-05 Well Mode changed to Gas Lift
1976-09-28 Well Fluid changed to Crude Oil
1976-09-28 Well Mode changed to Pumping
1993-08-30 Well Log Performed
1993-09-01 Well Log Performed
1993-10-04 Perforation Treatment Performed - Cement Plug
1993-10-04 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1944-05-28 Open Hole/Barefoot Completion 2542.30 2665.80 0
1944-06-04 Acid Wash 2631.90 2662.40 0
1944-06-08 Acid Wash 2567.90 2662.40 0
1944-06-11 Acid Wash 2567.90 2662.40 0
1944-07-09 Acid Wash 2567.90 2596.90 0
1964-05-31 Bullet Perforation 2624.30 2626.50 10
1993-10-04 Cement Plug 2544.50 2580.00 0
1993-10-04 Open Hole/Barefoot Completion 2542.30 2567.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7982 0.0 0.0 0.0
1968 5477 0.0 0.0 0.0
1969 6190 0.0 0.0 0.0
1970 8375 0.0 0.0 0.0
1971 7794 0.0 0.0 0.0
1972 7750 0.0 0.0 0.0
1973 7083 0.0 0.0 0.0
1974 3578 0.0 0.0 0.0
1975 8401 0.0 0.0 0.0
1976 7508 0.0 0.0 0.0
1977 8330 0.0 0.0 0.0
1978 8751 0.0 0.0 0.0
1979 7766 0.0 0.0 0.0
1980 8370 0.0 0.0 0.0
1981 8293 0.0 0.0 0.0
1982 8630 0.0 0.0 0.0
1983 8744 0.0 0.0 0.0
1984 8197 0.0 0.0 0.0
1985 8303 0.0 0.0 0.0
1986 8327 0.0 0.0 0.0
1987 7513 0.0 0.0 0.0
1988 8666 0.0 0.0 0.0
1989 8308 0.0 0.0 0.0
1990 8632 0.0 0.0 0.0
1991 8663 0.0 0.0 0.0
1992 7819 0.0 0.0 0.0
1993 5653 0.0 0.0 0.0
1994 8191 0.0 0.0 0.0
1995 8699 0.0 0.0 0.0
1996 7063 0.0 0.0 0.0
1997 8662 0.0 0.0 0.0
1998 3921 0.0 0.0 0.0
1999 8691 0.0 0.0 0.0
2000 8663 0.0 0.0 0.0
2001 7986 0.0 0.0 0.0
2002 7435 0.0 0.0 0.0
2003 6841 0.0 0.0 0.0
2004 6737 0.0 0.0 0.0
2005 6587 0.0 0.0 0.0
2006 7384 0.0 0.0 0.0
2007 4364 0.0 0.0 0.0
2008 2583 0.0 0.0 0.0
2009 5371 0.0 0.0 0.0
2010 2362 0.0 0.0 0.0
2011 5138 0.0 0.0 0.0
2012 5605 0.0 0.0 0.0
2013 1828 0.0 0.0 0.0
2014 5205 0.0 0.0 0.0
2015 8172 0.0 0.0 0.0
2016 8295 0.0 0.0 0.0
2017 7420 0.0 0.0 0.0
2018 7707 0.0 0.0 0.0
2019 5369 0.0 0.0 0.0
2020 2001 0.0 0.0 0.0

For data sources see[5]

References