If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0224082106020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.882512,"lon":-111.056735,"icon":""}]} |
| Location: 02/06-21-022-08W4/0 | |
| Location Alias: 02/06-21-22-08 W4M | |
| Location Alias 2: 02/06-21-022-08 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 022 | |
| Meridian: 4 | |
| Range: 08 | |
| Section: 21 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: CARDINAL ATL-BUFF 6-21-22-8 | |
| Operator Name: Cardinal Energy Ltd. | |
| License Number: 0066735 | |
| License Date: 1977-11-14 | |
| License Status: Abandoned | |
| Spud Date: 1978-06-08 | |
| Final Drill Date: 1978-06-10 | |
| Well Total Depth: 642.00 m | |
| Surface Hole Latitude: 50.882512 | |
| Surface Hole Longitude: -111.056735 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-11-14 | Obtained License |
| 1978-06-08 | Lost Circulation Occurred |
| 1978-06-10 | Finished Drilling |
| 1978-06-10 | Well Mode changed to Drilled and Cased |
| 1978-06-11 | Production Casing Operation Performed |
| 1978-06-15 | Perforation Treatment Performed - Selective Jet Perforations |
| 1978-06-17 | Perforation Treatment Performed - Fractured |
| 1978-07-06 | Perforation Treatment Performed - Selective Jet Perforations |
| 1978-07-07 | Perforation Treatment Performed - Fractured |
| 1979-04-26 | Well Began Production |
| 1979-04-26 | Well Fluid changed to Gas |
| 1979-04-26 | Well Mode changed to Flowing |
| 1993-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-10-17 | Plug Back Performed |
| 1993-10-17 | Well Abandoned |
| 1993-10-17 | Well Fluid changed to Gas |
| 1993-10-17 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-06-15 | Selective Jet Perforations | 357.20 | 358.10 | 0 |
| 1978-06-15 | Selective Jet Perforations | 611.40 | 617.20 | 0 |
| 1978-06-15 | Selective Jet Perforations | 618.10 | 618.10 | 0 |
| 1978-06-15 | Selective Jet Perforations | 619.70 | 620.30 | 0 |
| 1978-06-15 | Selective Jet Perforations | 624.80 | 625.80 | 0 |
| 1978-06-17 | Fracture | 357.20 | 625.80 | 0 |
| 1978-07-06 | Selective Jet Perforations | 357.20 | 358.10 | 0 |
| 1978-07-06 | Selective Jet Perforations | 381.90 | 382.20 | 0 |
| 1978-07-06 | Selective Jet Perforations | 390.10 | 390.40 | 0 |
| 1978-07-06 | Selective Jet Perforations | 410.30 | 418.50 | 0 |
| 1978-07-06 | Selective Jet Perforations | 419.10 | 419.40 | 0 |
| 1978-06-15 | Selective Jet Perforations | 381.90 | 382.20 | 0 |
| 1978-07-06 | Selective Jet Perforations | 419.70 | 420.90 | 0 |
| 1978-07-06 | Selective Jet Perforations | 426.40 | 426.40 | 0 |
| 1978-07-07 | Fracture | 357.20 | 426.40 | 0 |
| 1993-10-17 | Packing Device Capped w/Cement | 203.00 | 210.00 | 0 |
| 1978-06-15 | Selective Jet Perforations | 390.10 | 390.40 | 0 |
| 1978-06-15 | Selective Jet Perforations | 410.30 | 418.50 | 0 |
| 1978-06-15 | Selective Jet Perforations | 419.10 | 419.40 | 0 |
| 1978-06-15 | Selective Jet Perforations | 419.70 | 419.70 | 0 |
| 1978-06-15 | Selective Jet Perforations | 420.90 | 426.40 | 0 |
| 1978-06-15 | Selective Jet Perforations | 602.00 | 603.20 | 0 |
| 1978-06-15 | Selective Jet Perforations | 609.90 | 610.80 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 1763 | 0.0 | 0.0 | 0.0 |
| 1980 | 7909 | 0.0 | 0.0 | 0.0 |
| 1981 | 4613 | 0.0 | 0.0 | 0.0 |
| 1982 | 5456 | 0.0 | 0.0 | 0.0 |
| 1983 | 4639 | 0.0 | 0.0 | 0.0 |
| 1984 | 4317 | 0.0 | 0.0 | 0.0 |
| 1986 | 716 | 0.0 | 0.0 | 0.0 |
| 1987 | 653 | 0.0 | 0.0 | 0.0 |
| 1988 | 3737 | 0.0 | 0.0 | 0.0 |
| 1989 | 6268 | 0.0 | 0.0 | 0.0 |
| 1990 | 2654 | 0.0 | 0.0 | 0.0 |
| 1991 | 1438 | 0.0 | 0.0 | 0.0 |
| 1992 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1978-06-08 | Lost Circulation | 1.00 | 65.50 |
For data sources see[6]