If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224261412000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/12-14-022-26W4/0 | |
Location Alias: 00/12-14-22-26 W4M | |
Location Alias 2: 00/12-14-022-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 26 | |
Section: 14 | |
County/Municipality: Wheatland County | |
Well Name: PERSIST OIL ENTICE 12-14-22-26 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0412407 | |
License Date: 2009-09-17 | |
License Status: Issued | |
Spud Date: 2009-12-15 | |
Final Drill Date: 2010-01-03 | |
Well Total Depth: 958.00 m | |
Surface Hole Latitude: 50.872064 | |
Surface Hole Longitude: -113.509925 |
Date | Event |
---|---|
2009-09-17 | Obtained License |
2009-12-15 | Surface Casing Operation Performed |
2010-01-03 | Finished Drilling |
2010-01-03 | Production Casing Operation Performed |
2010-01-03 | Rig Released |
2010-01-03 | Well Mode changed to Drilled and Cased |
2010-01-07 | Well Log Performed |
2010-01-23 | Perforation Treatment Performed - Jet Perforation |
2010-02-03 | Perforation Treatment Performed - Fractured |
2010-02-06 | Well Fluid changed to Gas |
2010-02-06 | Well Mode changed to Testing |
2010-02-15 | Perforation Treatment Performed - Jet Perforation |
2010-02-16 | Perforation Treatment Performed - Fractured |
2010-02-24 | Well Began Production |
2010-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-24 | Well Mode changed to Flowing |
2010-04-12 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-23 | Perforation | 694.50 | 696.50 | 13 |
2010-02-15 | Perforation | 190.00 | 193.00 | 13 |
2010-02-15 | Perforation | 433.50 | 435.50 | 13 |
2010-02-15 | Perforation | 426.50 | 429.50 | 13 |
2010-02-15 | Perforation | 450.50 | 451.00 | 13 |
2010-02-15 | Perforation | 484.00 | 484.50 | 13 |
2010-02-15 | Perforation | 569.10 | 569.60 | 13 |
2010-02-15 | Perforation | 556.90 | 557.40 | 13 |
2010-02-15 | Perforation | 550.90 | 551.40 | 13 |
2010-02-15 | Perforation | 470.90 | 471.40 | 13 |
2010-02-15 | Perforation | 463.70 | 464.20 | 13 |
2010-01-23 | Perforation | 735.00 | 738.00 | 13 |
2010-02-15 | Perforation | 476.80 | 478.80 | 13 |
2010-02-15 | Perforation | 472.30 | 473.30 | 13 |
2010-02-16 | Fracture | 400.90 | 569.60 | 0 |
2010-02-03 | Fracture | 694.50 | 696.50 | 0 |
2010-02-03 | Fracture | 735.00 | 738.00 | 0 |
2010-02-15 | Perforation | 421.00 | 421.50 | 13 |
2010-02-15 | Perforation | 400.90 | 401.40 | 13 |
2010-02-15 | Perforation | 443.20 | 445.20 | 13 |
2010-02-15 | Perforation | 436.30 | 437.30 | 13 |
2010-02-15 | Perforation | 299.50 | 301.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7491 | 0.0 | 0.0 | 0.0 |
2011 | 8757 | 0.0 | 0.0 | 0.0 |
2012 | 8633 | 0.0 | 0.0 | 0.0 |
2013 | 8558 | 0.0 | 0.0 | 0.0 |
2014 | 8653 | 0.0 | 0.0 | 0.0 |
2015 | 8566 | 0.0 | 0.0 | 0.0 |
2016 | 8436 | 0.0 | 0.0 | 0.0 |
2017 | 8664 | 0.0 | 0.0 | 0.0 |
2018 | 8595 | 0.0 | 0.0 | 0.0 |
2019 | 8748 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]