X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224262612000

Well Details

Well ID: 0224262612000
Loading map...
Location: 00/12-26-022-26W4/0
Location Alias: 00/12-26-22-26 W4M
Location Alias 2: 00/12-26-022-26 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 26
Section: 26
County/Municipality: Wheatland County
Well Name: PERSIST OIL ENTICE 12-26-22-26
Operator Name: Persist Oil And Gas Inc.
License Number: 0165362
License Date: 1994-02-23
License Status: Issued
Spud Date: 1994-04-26
Final Drill Date: 1994-05-09
Well Total Depth: 1909.00 m
Surface Hole Latitude: 50.900323
Surface Hole Longitude: -113.507960

For data sources see[1][2]

Well History

Date Event
1994-02-23 Obtained License
1994-04-28 Surface Casing Operation Performed
1994-04-28 Well Log Performed
1994-05-05 Drill Stem Test Performed
1994-05-06 Direction Drilling Operation Performed - Deviate
1994-05-09 Finished Drilling
1994-05-10 Well Log Performed
1994-05-11 Production Casing Operation Performed
1994-05-11 Rig Released
1994-05-11 Well Mode changed to Drilled and Cased
1994-05-13 Well Log Performed
1994-05-27 Well Log Performed
1994-05-28 Perforation Treatment Performed - Jet Perforation
1994-06-01 Well Log Performed
1994-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-02 Perforation Treatment Performed - Jet Perforation
1994-06-04 Well Log Performed
1994-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-05 Plug Back Performed
1994-06-05 Well Mode changed to Abandoned Zone
2008-07-15 Well Log Performed
2010-06-22 Well Log Performed
2010-07-08 Perforation Treatment Performed - Jet Perforation
2010-07-24 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-05-06 1572.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-28 Perforation 1551.00 1554.50 13
2010-07-08 Perforation 376.90 377.40 13
2010-07-08 Perforation 554.50 557.50 13
2010-07-08 Perforation 309.20 309.70 13
2010-07-08 Perforation 319.00 320.00 13
2010-07-08 Perforation 463.30 464.30 13
2010-07-08 Perforation 550.30 551.30 13
2010-07-08 Perforation 575.30 576.30 13
2010-07-08 Perforation 585.10 588.10 13
2010-07-08 Perforation 499.40 501.40 13
2010-07-08 Perforation 476.70 477.20 13
1994-06-02 Packing Device Capped w/Cement 1532.00 1540.00 0
2010-07-08 Perforation 479.20 479.70 13
2010-07-08 Perforation 491.00 491.50 13
2010-07-24 Fracture 554.50 557.50 0
2010-07-24 Fracture 309.20 588.10 0
1994-06-02 Perforation 937.00 943.00 13
1994-06-02 Perforation 944.50 949.50 13
1994-06-02 Perforation 951.00 956.00 13
1994-06-05 Packing Device Capped w/Cement 919.00 927.00 0
2010-07-08 Perforation 442.00 443.00 13
2010-07-08 Perforation 446.30 446.80 13
2010-07-08 Perforation 457.80 458.80 13

For data sources see[5]



References