If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0224262702002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.894559,"lon":-113.524586,"icon":""}]} |
| Location: 00/02-27-022-26W4/2 | |
| Location Alias: 00/02-27-22-26 W4M | |
| Location Alias 2: 00/02-27-022-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 022 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 27 | |
| County/Municipality: Wheatland County | |
| Well Name: PERSIST OIL ENTICE 2-27-22-26 | |
| Operator Name: Persist Oil And Gas Inc. | |
| License Number: 0228535 | |
| License Date: 1999-11-09 | |
| License Status: Issued | |
| Spud Date: 1999-11-19 | |
| Final Drill Date: 1999-11-20 | |
| Well Total Depth: 1065.00 m | |
| Surface Hole Latitude: 50.894559 | |
| Surface Hole Longitude: -113.524586 |
| Date | Event |
|---|---|
| 1999-11-09 | Obtained License |
| 1999-11-19 | Surface Casing Operation Performed |
| 1999-11-20 | Finished Drilling |
| 1999-11-20 | Well Mode changed to Drilled and Cased |
| 1999-11-21 | Production Casing Operation Performed |
| 1999-11-21 | Rig Released |
| 1999-11-25 | Well Log Performed |
| 1999-12-03 | Perforation Treatment Performed - Jet Perforation |
| 2003-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-21 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-27 | Perforation Treatment Performed - Fractured |
| 2003-11-19 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2003-11-19 | Well Log Performed |
| 2003-11-19 | Well Mode changed to Testing |
| 2006-09-19 | Well Began Production |
| 2006-09-19 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2006-09-19 | Well Mode changed to Flowing |
| 2009-01-04 | Perforation Treatment Performed - Fractured |
| 2009-07-02 | Well Log Performed |
| 2017-03-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2017-03-29 | Well Mode changed to Flowing |
| 2017-07-01 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2017-07-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1999-12-03 | Perforation | 746.00 | 749.00 | 7 |
| 2003-10-21 | Perforation | 567.10 | 568.10 | 13 |
| 2003-10-21 | Perforation | 553.00 | 554.00 | 13 |
| 2003-10-21 | Perforation | 498.70 | 499.70 | 13 |
| 2003-10-21 | Perforation | 493.60 | 495.60 | 13 |
| 2003-10-21 | Perforation | 481.60 | 483.60 | 13 |
| 2003-10-21 | Perforation | 475.70 | 476.70 | 13 |
| 2003-10-21 | Perforation | 465.10 | 466.10 | 13 |
| 2003-10-21 | Perforation | 461.60 | 462.60 | 13 |
| 2003-10-21 | Perforation | 457.00 | 458.00 | 13 |
| 2003-10-21 | Perforation | 453.50 | 454.50 | 13 |
| 2003-03-21 | Perforation | 851.00 | 853.00 | 13 |
| 2003-10-21 | Perforation | 448.70 | 449.70 | 13 |
| 2003-10-21 | Perforation | 435.70 | 436.70 | 13 |
| 2003-10-21 | Perforation | 345.20 | 346.20 | 13 |
| 2003-10-21 | Perforation | 333.20 | 334.20 | 13 |
| 2003-10-21 | Perforation | 326.30 | 328.30 | 13 |
| 2003-10-27 | Fracture | 326.30 | 640.10 | 0 |
| 2009-01-04 | Fracture | 326.30 | 640.10 | 0 |
| 2003-03-21 | Perforation | 695.00 | 699.00 | 13 |
| 2003-10-21 | Perforation | 639.10 | 640.10 | 13 |
| 2003-10-21 | Perforation | 633.60 | 634.60 | 13 |
| 2003-10-21 | Perforation | 631.80 | 632.80 | 13 |
| 2003-10-21 | Perforation | 585.80 | 586.80 | 13 |
| 2003-10-21 | Perforation | 583.10 | 585.10 | 13 |
| 2003-10-21 | Perforation | 572.90 | 573.90 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 3 | 0.0 | 0.0 | 0.0 |
| 2006 | 1824 | 0.0 | 0.0 | 0.0 |
| 2007 | 8683 | 0.0 | 0.0 | 0.0 |
| 2008 | 8087 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8757 | 0.0 | 0.0 | 0.0 |
| 2012 | 8634 | 0.0 | 0.0 | 0.0 |
| 2013 | 8558 | 0.0 | 0.0 | 0.0 |
| 2014 | 8653 | 0.0 | 0.0 | 0.0 |
| 2015 | 8621 | 0.0 | 0.0 | 0.0 |
| 2016 | 8436 | 0.0 | 0.0 | 0.0 |
| 2017 | 7951 | 0.0 | 0.0 | 0.0 |
| 2018 | 8011 | 0.0 | 0.0 | 0.0 |
| 2019 | 8748 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]