If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224262709000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/09-27-022-26W4/0 | |
Location Alias: 00/09-27-22-26 W4M | |
Location Alias 2: 00/09-27-022-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: PERSIST OIL ENTICE 9-27-22-26 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0441847 | |
License Date: 2011-12-21 | |
License Status: Issued | |
Spud Date: 2012-01-16 | |
Final Drill Date: 2012-01-18 | |
Well Total Depth: 1265.00 m | |
Surface Hole Latitude: 50.895146 | |
Surface Hole Longitude: -113.524248 |
Date | Event |
---|---|
2011-12-21 | Obtained License |
2012-01-16 | Direction Drilling Operation Performed - Deviate |
2012-01-17 | Surface Casing Operation Performed |
2012-01-18 | Finished Drilling |
2012-01-18 | Production Casing Operation Performed |
2012-01-18 | Well Mode changed to Drilled and Cased |
2012-01-19 | Rig Released |
2012-01-26 | Well Log Performed |
2012-02-09 | Perforation Treatment Performed - Jet Perforation |
2012-02-12 | Perforation Treatment Performed - Fractured |
2012-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-15 | Well Mode changed to Testing |
2012-02-21 | Perforation Treatment Performed - Jet Perforation |
2012-02-28 | Perforation Treatment Performed - Fractured |
2012-05-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-05-15 | Well Mode changed to Test Completed |
2012-09-11 | Well Began Production |
2012-09-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-09-11 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-16 | Precision Drilling Corporation | 155 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-16 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-09 | Perforation | 901.00 | 903.00 | 13 |
2012-02-21 | Perforation | 497.30 | 498.30 | 13 |
2012-02-21 | Perforation | 500.70 | 501.20 | 13 |
2012-02-21 | Perforation | 523.50 | 524.00 | 13 |
2012-02-21 | Perforation | 561.50 | 562.50 | 13 |
2012-02-21 | Perforation | 579.60 | 580.60 | 13 |
2012-02-21 | Perforation | 585.20 | 586.20 | 13 |
2012-02-21 | Perforation | 592.10 | 593.10 | 13 |
2012-02-21 | Perforation | 600.90 | 601.90 | 13 |
2012-02-21 | Perforation | 605.70 | 606.20 | 13 |
2012-02-21 | Perforation | 606.90 | 608.40 | 13 |
2012-02-09 | Perforation | 1057.50 | 1059.50 | 13 |
2012-02-21 | Perforation | 608.70 | 609.20 | 13 |
2012-02-21 | Perforation | 622.60 | 623.10 | 13 |
2012-02-21 | Perforation | 627.40 | 628.40 | 13 |
2012-02-21 | Perforation | 637.70 | 638.70 | 13 |
2012-02-21 | Perforation | 640.00 | 642.50 | 13 |
2012-02-21 | Perforation | 643.70 | 644.20 | 13 |
2012-02-21 | Perforation | 648.90 | 650.90 | 13 |
2012-02-21 | Perforation | 656.10 | 657.10 | 13 |
2012-02-21 | Perforation | 690.00 | 690.50 | 13 |
2012-02-21 | Perforation | 718.80 | 719.80 | 13 |
2012-02-12 | Fracture | 901.00 | 903.00 | 0 |
2012-02-21 | Perforation | 723.80 | 724.30 | 13 |
2012-02-21 | Perforation | 742.60 | 743.60 | 13 |
2012-02-21 | Perforation | 749.90 | 750.90 | 13 |
2012-02-21 | Perforation | 762.00 | 764.00 | 13 |
2012-02-21 | Perforation | 765.30 | 766.30 | 13 |
2012-02-21 | Perforation | 818.60 | 819.60 | 13 |
2012-02-21 | Perforation | 824.10 | 824.60 | 13 |
2012-02-21 | Perforation | 830.70 | 831.20 | 13 |
2012-02-28 | Fracture | 398.80 | 831.20 | 0 |
2012-02-12 | Fracture | 1057.50 | 1059.50 | 0 |
2012-02-21 | Perforation | 398.80 | 399.30 | 13 |
2012-02-21 | Perforation | 420.50 | 421.50 | 13 |
2012-02-21 | Perforation | 422.40 | 422.90 | 13 |
2012-02-21 | Perforation | 433.00 | 435.00 | 13 |
2012-02-21 | Perforation | 453.50 | 454.00 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2608 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8650 | 0.0 | 0.0 | 0.0 |
2015 | 8704 | 0.0 | 0.0 | 0.0 |
2016 | 8735 | 0.0 | 0.0 | 0.0 |
2017 | 8570 | 0.0 | 0.0 | 0.0 |
2018 | 8678 | 0.0 | 0.0 | 0.0 |
2019 | 8748 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]