If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224271215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.861214,"lon":-113.612803,"icon":""}]} |
Location: 00/15-12-022-27W4/0 | |
Location Alias: 00/15-12-22-27 W4M | |
Location Alias 2: 00/15-12-022-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 27 | |
Section: 12 | |
County/Municipality: Rocky View County | |
Well Name: PERSIST OIL ENTICE 15-12-22-27 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0407550 | |
License Date: 2009-01-09 | |
License Status: Suspension | |
Spud Date: 2009-01-14 | |
Final Drill Date: 2009-01-15 | |
Well Total Depth: 1061.00 m | |
Surface Hole Latitude: 50.861214 | |
Surface Hole Longitude: -113.612803 |
Date | Event |
---|---|
2009-01-09 | Obtained License |
2009-01-14 | Lost Circulation Occurred |
2009-01-14 | Surface Casing Operation Performed |
2009-01-15 | Finished Drilling |
2009-01-15 | Production Casing Operation Performed |
2009-01-15 | Rig Released |
2009-01-15 | Well Mode changed to Drilled and Cased |
2009-01-23 | Well Log Performed |
2009-02-06 | Perforation Treatment Performed - Jet Perforation |
2009-02-18 | Perforation Treatment Performed - Jet Perforation |
2009-02-20 | Perforation Treatment Performed - Fractured |
2009-03-26 | Well Began Production |
2009-03-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-26 | Well Mode changed to Flowing |
2019-04-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2019-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-06 | Perforation | 910.00 | 911.50 | 13 |
2009-02-18 | Perforation | 383.90 | 384.40 | 14 |
2009-02-18 | Perforation | 579.00 | 581.00 | 14 |
2009-02-18 | Perforation | 261.00 | 263.00 | 14 |
2009-02-18 | Perforation | 251.00 | 253.00 | 14 |
2009-02-18 | Perforation | 220.00 | 222.00 | 14 |
2009-02-18 | Perforation | 324.00 | 326.00 | 14 |
2009-02-18 | Perforation | 551.00 | 553.00 | 14 |
2009-02-18 | Perforation | 472.00 | 474.00 | 14 |
2009-02-18 | Perforation | 374.00 | 376.00 | 14 |
2009-02-18 | Perforation | 598.80 | 599.30 | 14 |
2009-02-06 | Perforation | 969.00 | 971.00 | 13 |
2009-02-18 | Perforation | 613.60 | 614.10 | 14 |
2009-02-18 | Perforation | 541.40 | 543.40 | 14 |
2009-02-18 | Perforation | 548.50 | 549.50 | 14 |
2009-02-18 | Perforation | 631.90 | 632.40 | 14 |
2009-02-18 | Perforation | 676.60 | 677.10 | 14 |
2009-02-18 | Perforation | 618.30 | 618.80 | 14 |
2009-02-18 | Perforation | 629.40 | 630.40 | 14 |
2009-02-18 | Perforation | 507.80 | 508.80 | 14 |
2009-02-18 | Perforation | 503.50 | 505.50 | 14 |
2009-02-18 | Perforation | 498.90 | 499.90 | 14 |
2009-02-06 | Perforation | 1002.00 | 1004.00 | 13 |
2009-02-18 | Perforation | 520.30 | 520.80 | 14 |
2009-02-18 | Perforation | 533.60 | 534.10 | 14 |
2009-02-18 | Perforation | 518.00 | 518.50 | 14 |
2009-02-18 | Perforation | 531.60 | 532.10 | 14 |
2009-02-20 | Fracture | 220.00 | 581.00 | 0 |
2009-02-20 | Fracture | 317.90 | 677.10 | 0 |
2009-02-18 | Perforation | 359.40 | 359.90 | 14 |
2009-02-18 | Perforation | 354.90 | 355.40 | 14 |
2009-02-18 | Perforation | 317.90 | 318.40 | 14 |
2009-02-18 | Perforation | 364.30 | 364.80 | 14 |
2009-02-18 | Perforation | 481.80 | 482.30 | 14 |
2009-02-18 | Perforation | 478.60 | 479.60 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6730 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8754 | 0.0 | 0.0 | 0.0 |
2012 | 4316 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8650 | 0.0 | 0.0 | 0.0 |
2015 | 8488 | 0.0 | 0.0 | 0.0 |
2016 | 7683 | 0.0 | 0.0 | 0.0 |
2017 | 2825 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-01-14 | Lost Circulation | 98.00 | 105.00 |
For data sources see[6]